Revision history of "ECOLOGICAL MUNICIPALITY WĄWOLCA" (Q104792)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 20:3820:38, 2 March 2023DG Regio talk contribs 88,840 bytes +947 Changed label, description and/or aliases in lv, da, sk, it, cs, el, ga, et, fr, bg, fi, lt, nl, hr, ro, hu, sv, pt, de, mt, sl, es, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5212:52, 2 July 2022DG Regio talk contribs 85,782 bytes +55,998 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 17,365 bytes +3,160 Created claim: summary (P836): Le projet (P.) suppose l’installation de 104 pcs. ensemble de bobines solaires (69 pcs. 2 panneaux d’une puissance de 3,4 kW chacun et 35 pièces. 3 panneaux d’une puissance de 5,1 kW chacun) dans l’objet. privé. à Chaleur. CWU d’une capacité totale de 0,41 MW situé exclusivement sur le toit ou sur la façade. P. prévoit également la conception et l’exécution du portail Internet, qui assurera les fonctions d’éducation, de promotion et d’offre de s...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,205 bytes +97 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,547 bytes +91 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,456 bytes −74 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,530 bytes +2,871 Created claim: summary (P836): The project (P.) assumes installation of 104 units. set of solar panels (69 pcs. 2 panels with 3.4 kW each and 35 pcs. 3-panels with a power of 5.1 kW each) in the object. privat. for warming. CWU with a total power of 0,41 MW placed only on the roof or on the facade. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offers on-line services, SW execution service, Proje...
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 11,659 bytes −2,217 Removed claim: summary (P836): The project (p.) involves the installation of 104 solar glass (69 units). 2 panel 3.4 kW each and 35 units 3 kW (s) each) for the kill. CWUs with a total capacity of 0.41 MW only on the roof or on the façade. It also provides for the design and implementation of the website. Total number of bellows. The beneficiaries (GRUPA DOCELOV GROUP) will be responsible for the implementation of Ms P. 400 in 104 sites. The main customs of P. is the increa...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,585 bytes +2,217 Created claim: summary (P836): The project (p.) involves the installation of 104 solar glass (69 units). 2 panel 3.4 kW each and 35 units 3 kW (s) each) for the kill. CWUs with a total capacity of 0.41 MW only on the roof or on the façade. It also provides for the design and implementation of the website. Total number of bellows. The beneficiaries (GRUPA DOCELOV GROUP) will be responsible for the implementation of Ms P. 400 in 104 sites. The main customs of P. is the increase...

24 February 2020

18 February 2020

31 January 2020

14 January 2020