Revision history of "Renewable energy in the municipality of Łabunie" (Q104782)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 87,039 bytes +50 Set a claim value: summary (P836): O principal objetivo do projeto é «Melhorar o estado do ar atmosférico através do aumento da produção de energia a partir de FER». Este objetivo será alcançado através da realização de ações que envolvam a montagem: 141 instalações de coletores solares planos num edifício ou terreno b) 41 instalações de painéis solares planos do tipo «na rede» numa superfície inclinada, plana ou vertical. O projeto estará localizado em todas as 13 aldeias de Gm. Łab...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2311:23, 27 July 2022DG Regio talk contribs 81,706 bytes +53,160 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 16,937 bytes +2,881 Created claim: summary (P836): L’objectif principal du projet est «Améliorer l’air atmosphérique en augmentant la production d’énergie basée sur les SER». Pour ce faire, des opérations d’assemblage seront réalisées: 141 installations de capteurs solaires plats sur un bâtiment ou un terrain b) 41 installations de panneaux photovoltaïques plats «sur réseau» sur une surface inclinée, plane ou verticale. Le projet sera situé dans les 13 villes de Gm. Łabunie. Les actions aboutiro...
  • curprev 09:1209:12, 1 December 2021DG Regio talk contribs 14,056 bytes +110 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,385 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,278 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,385 bytes +2,645 Created claim: summary (P836): The main objective of the project is “Improving atmospheric air status by increasing RES-based energy production”. It will be achieved by carrying out actions involving assembly: 141 installations of flat solar collectors on a building or land (b) 41 installations of flat solar panels of the type “on-grid” on an inclined, flat or vertical surface. The project will be located in all 13 villages of Gm. Łabunie. The result of the activities will be...
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 11,740 bytes −2,126 Removed claim: summary (P836): The main objective of the project is ‘Improvement of the atmospheric conditions by increasing the production of energy from RES’. This will be achieved by carrying out the following activities: (a) 141 solar collectors in the building or in (b) 41 flat -grid flat panel installation on an inclined, flat or vertical surface. The project will be located in all 13 localities of Gm. The activities will result in the deployment of 182 RES systems (I...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,584 bytes +2,126 Created claim: summary (P836): The main objective of the project is ‘Improvement of the atmospheric conditions by increasing the production of energy from RES’. This will be achieved by carrying out the following activities: (a) 141 solar collectors in the building or in (b) 41 flat -grid flat panel installation on an inclined, flat or vertical surface. The project will be located in all 13 localities of Gm. The activities will result in the deployment of 182 RES systems (ICT...

24 February 2020

18 February 2020

31 January 2020

14 January 2020