Revision history of "Reduction of pollutant emissions in the municipality of Biłgoraj through the use of RES – stage III" (Q104769)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 85,198 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 85,198 bytes +28 Set a claim value: summary (P836): O objetivo do projeto é proteger o ambiente e aumentar a utilização de energia proveniente de fontes renováveis (FER). O projeto incluirá 446 instalações de coletores solares com uma potência total de 1613,55 kW (instalações solares em edifícios residenciais: 311-2 colectores + 200 l; 124-3 colectores + 300 l; 8-4 colectores + 400 l; 3-5 coletores + 500 l) que utilizam energia solar para a produção de energia térmica e 116 caldeiras a biomassa em ed...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 82,773 bytes +500 Changed label, description and/or aliases in it, sk, da, sv, el, fi, cs, hu, et, bg, lv, ga, ro, pt, es, mt, lt, hr, de, nl, sl, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5212:52, 2 July 2022DG Regio talk contribs 80,159 bytes +51,988 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1109:11, 1 December 2021DG Regio talk contribs 16,774 bytes +2,877 Created claim: summary (P836): L’objectif du projet est de protéger l’environnement et d’accroître l’utilisation des sources d’énergie renouvelables (SER). Le projet installera 446 installations de collecteurs solaires d’une capacité totale de 1 613,55 kW (installations solaires sur bâtiments résidentiels: 311-2 collecteurs + 200 l; 124-3 collecteurs + 300 l; 8-4 collecteurs + 400 l; 3-5 capteurs + 500 l) utilisant l’énergie solaire pour produire de la chaleur et 116 chaudièr...
  • curprev 09:1109:11, 1 December 2021DG Regio talk contribs 13,897 bytes +181 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,155 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 13,993 bytes −161 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 14,154 bytes +2,483 Created claim: summary (P836): The aim of the project is to protect the environment and increase the use of energy from renewable sources (RES). The project will include 446 solar collector installations with a total power of 1613.55 kW (solar installations on residential buildings: 311-2 collectors + 200 l; 124-3 collectors + 300 l; 8-4 collectors + 400 l; 3-5 collectors + 500 l) using solar energy for the production of thermal energy and 116 biomass boilers in residential b...
  • curprev 16:5716:57, 17 October 2020DG Regio talk contribs 11,671 bytes −1,969 Removed claim: summary (P836): The project aims to protect the environment and increase the use of energy from renewable sources (RES). 446 solar collectors will be installed within the project having a total capacity of 1 613.55 kW (solar installations in residential buildings: 311-2 collection + 200 l; 124-3 collection + 300 l; 8-4 collection + 400 l; 3-5 collecting + 500 l) using solar energy for heat generation and 116 biomass boilers in residential buildings with total...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 12,348 bytes +1,969 Created claim: summary (P836): The project aims to protect the environment and increase the use of energy from renewable sources (RES). 446 solar collectors will be installed within the project having a total capacity of 1 613.55 kW (solar installations in residential buildings: 311-2 collection + 200 l; 124-3 collection + 300 l; 8-4 collection + 400 l; 3-5 collecting + 500 l) using solar energy for heat generation and 116 biomass boilers in residential buildings with total p...

24 February 2020

18 February 2020

31 January 2020

14 January 2020