Revision history of "Renewable energy in the Drel Town" (Q104744)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5112:51, 2 July 2022DG Regio talk contribs 74,968 bytes +48,052 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1109:11, 1 December 2021DG Regio talk contribs 16,256 bytes +2,751 Created claim: summary (P836): L’objet du projet est l’achat et l’installation de 452 ensembles de panneaux solaires d’une capacité totale de 1 692 kW et de 27 poêles à biomasse d’une capacité totale de 925 kW. Les fours seront installés sur des bâtiments privés et publics (Botłownia Six Health Center, école primaire de Žerocin, GOPS Drelów, GCK Drelów, Département de la bibliothèque publique à Six, Maison populaire Witoroz). Il prévoit également l’installation de 12 pompes à...
  • curprev 09:1109:11, 1 December 2021DG Regio talk contribs 13,505 bytes +115 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 13,829 bytes +92 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 13,737 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 13,842 bytes +2,473 Created claim: summary (P836): The subject of the project is the purchase and installation of 452 sets of solar panels with a total power of 1692 kW and 27 units of biomass kilns with a total power of 925 kW. The furnaces will be installed on private buildings and public buildings (Booling House Six of the Health Centre, Primary School Żerocin, GOPS Drelów, GCK Drelów, Philia Public Library in Six, People’s House Witoroż). There are also plans to install 12 overhead heat pump...
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 11,369 bytes −2,063 Removed claim: summary (P836): The project concerns the purchase and installation of 452 sets of solar panels with a combined output of 1 692 kW and 27 biomass biomass furnaces with a total power output of 925 kW. The furnaces will be installed on private and public buildings (Sixth centre of the centre for health, Żecroin Primary School, GOPS Drów, GCK Dogów, Filia Public Library, in the Six, the People’s House of Witroku). It also foresees the installation of 12 overhead...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2309:23, 9 March 2020DG Regio talk contribs 12,142 bytes +2,063 Created claim: summary (P836): The project concerns the purchase and installation of 452 sets of solar panels with a combined output of 1 692 kW and 27 biomass biomass furnaces with a total power output of 925 kW. The furnaces will be installed on private and public buildings (Sixth centre of the centre for health, Żecroin Primary School, GOPS Drów, GCK Dogów, Filia Public Library, in the Six, the People’s House of Witroku). It also foresees the installation of 12 overhead he...

24 February 2020

18 February 2020

31 January 2020

14 January 2020