Revision history of "Renewable energy sources for the City of Terespol – Step II" (Q104737)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 83,559 bytes +4 Changed label, description and/or aliases in pt
  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 83,555 bytes +44 Set a claim value: summary (P836): O projeto incluirá 278 instalações FER (indicadores de produto do projeto), incluindo: 149 instalações de colectores solares com potência total: 0,646 MW, 11 bombas de calor de ar com uma capacidade total de 0,038 MW, 69 fornos de biomassa com uma capacidade total de 1,275 MW e 49 instalações fotovoltaicas abertas com uma capacidade total de 0,116 MW. A potência total instalada dos dispositivos será: 2 075 MW. Todas as instalações serão localizadas...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:4918:49, 2 March 2023DG Regio talk contribs 81,114 bytes +318 Changed label, description and/or aliases in da, sk, it, lv, cs, pt, et, fr, fi, ga, sv, ro, sl, lt, hr, de, nl, mt, hu, es, bg, el, and other parts

27 October 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 12:5112:51, 2 July 2022DG Regio talk contribs 78,687 bytes +50,827 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 16,622 bytes +2,860 Created claim: summary (P836): Dans le cadre du projet, 278 installations SER (indicateurs de produits du projet) seront mises en œuvre, notamment: 149 installations de capteurs solaires à puissance totale: 0,646 MW, 11 pompes à chaleur à air d’une capacité totale de 0,038 MW, 69 fours à biomasse d’une capacité totale de 1,275 MW et 49 installations photovoltaïques ouvertes d’une capacité totale de 0,116 MW. La puissance totale installée de l’équipement sera: 2,075 MW. Toutes...
  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 13,762 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,069 bytes +120 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 13,949 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,044 bytes +2,490 Created claim: summary (P836): The project will include 278 RES installations (product indicators of the project), including: 149 solar collector installations with total power: 0,646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass furnaces with a total capacity of 1,275 MW and 49 open photovoltaic installations with a total capacity of 0,116 MW. The total installed power of the devices will be: 2,075 MW. All installations will be located on private reside...
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 11,554 bytes −2,076 Removed claim: summary (P836): Under the project, 278 RES installations (project output indicators) will be implemented, including: 149 solar collectors installations with total capacity: 0.646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass stoves with a total capacity of 1.275 MW and 49 open photovoltaic installations with a total capacity of 0.116 MW. The total installed capacity of the equipment shall be as follows: 2.075 MW. All installations will b...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2209:22, 9 March 2020DG Regio talk contribs 12,340 bytes +2,076 Created claim: summary (P836): Under the project, 278 RES installations (project output indicators) will be implemented, including: 149 solar collectors installations with total capacity: 0.646 MW, 11 air heat pumps with a total capacity of 0.038 MW, 69 biomass stoves with a total capacity of 1.275 MW and 49 open photovoltaic installations with a total capacity of 0.116 MW. The total installed capacity of the equipment shall be as follows: 2.075 MW. All installations will be...

24 February 2020

18 February 2020

31 January 2020

14 January 2020