Revision history of "Sunny Garbages" (Q104733)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 92,834 bytes +3 Changed label, description and/or aliases in pt
  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 92,831 bytes −56 Set a claim value: summary (P836): O projeto (P.) estará localizado no território de Lubel., no distrito de Lubelskie, no edifício Garbów (GG). Âmbito P. assume a instalação de 155 unidades. conjunto de células fotovoltaicas. em um objeto privado para a produção de eletricidade da soma de potência de 0,4568 MW. P. também prevê a conceção e execução do portal da Internet, que realizará serviços educativos, promocionais e online. Número total de foles. Utilização de GG. (alvo GRUPA) co...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:2900:29, 3 March 2023DG Regio talk contribs 90,490 bytes +1,864 Changed label, description and/or aliases in sl, lv, pt, fi, de, et, nl, hr, it, el, mt, ga, fr, sk, es, sv, lt, bg, da, cs, ro, hu, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2311:23, 27 July 2022DG Regio talk contribs 86,508 bytes +56,457 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 17,513 bytes +3,250 Created claim: summary (P836): Le projet (P.) sera situé à Lubel. Voïvodie, dans la région de Lublin, à Garbów (GG). La gamme P. suppose l’installation de 155 pièces. ensemble de cellules photovoltaïques. dans l’objet. privé. pour la production d’électricité. d’une puissance totale de 0,4568 MW. P. prévoit également la conception et l’exécution d’un portail Internet, qui assurera des services éducatifs, promotionnels et en ligne. Nombre total de soufflets. Avantages GG. (Grou...
  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 14,263 bytes +78 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,624 bytes +73 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,551 bytes −71 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,622 bytes +2,940 Created claim: summary (P836): The project (P.) will be located on the territory of Lubel., in the Lubelskie district, in the Garbów (GG) building. Scope P. assumes the installation of 155 units. set of photovoltaic cells. into a private object for the production of electricity of the sum of power of 0,4568 MW. P. also provides for the design and execution of the internet portal, which will perform educational, promotional and online services. Total number of bellows. GG’s us...
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 11,682 bytes −2,353 Removed claim: summary (P836): The project (P) will be located in. The scope of P. requires the installation of 155 units of photovoltaic cells. for the production of electricity for an electrical energy production of 0.4568 MW. It also foresees the design and execution of an internet portal which will serve as educational, promotional and online services. Total number of bellows. Benefit of GG. (DOCELOWA group) on the effects of implementation. P will be more than 600 in 1...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2209:22, 9 March 2020DG Regio talk contribs 12,752 bytes +2,353 Created claim: summary (P836): The project (P) will be located in. The scope of P. requires the installation of 155 units of photovoltaic cells. for the production of electricity for an electrical energy production of 0.4568 MW. It also foresees the design and execution of an internet portal which will serve as educational, promotional and online services. Total number of bellows. Benefit of GG. (DOCELOWA group) on the effects of implementation. P will be more than 600 in 155...

24 February 2020

18 February 2020

31 January 2020

14 January 2020