Revision history of "Clean energy in Milan II" (Q104726)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 12:5112:51, 2 July 2022DG Regio talk contribs 81,830 bytes +52,979 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 17,061 bytes +3,035 Created claim: summary (P836): 256 installations de capteurs solaires (156 avec une puissance de 3,1 KW, 84 avec une puissance de 4,65 KW, 15 avec une puissance de 6,2 KW, 1 installation avec une puissance de 7,75 KW) et deux installations photovoltaïques d’une puissance de 2 KW seront réalisées. La puissance totale installée pour les dispositifs solaires sera: 0,97 MW. Toutes les installations seront réalisées directement sur les toits et façades des bâtiments résidentiels p...
  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 14,026 bytes +102 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,363 bytes +83 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,280 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,386 bytes +2,702 Created claim: summary (P836): There will be 256 solar collector installations (156 with a capacity of 3.1 KW, 84 with a capacity of 4.65 KW, 15 with a capacity of 6.2 KW, 1 installation with a capacity of 7.75 KW) and two photovoltaic installations with a capacity of 2 KW. The total installed power for solar energy devices will be: 0,97 MW. All installations will be implemented directly on the roofs and facades of private residential buildings (there are no public buildings...
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 11,684 bytes −2,133 Removed claim: summary (P836): 256 solar collectors will be installed (156 with 3,1 KW, 84 KW, 15 with a power of 6,2 KW, 1 installation with a power of 7,75 KW) and two solar installations with a power of 2 KW. The total installed capacity for solar power equipment will be: 0.97 MW. All installations will be built directly on the roofs and façade of private dwellings (there are no public works and those in which the economic activity takes place), up to a height of up to 3...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2209:22, 9 March 2020DG Regio talk contribs 12,532 bytes +2,133 Created claim: summary (P836): 256 solar collectors will be installed (156 with 3,1 KW, 84 KW, 15 with a power of 6,2 KW, 1 installation with a power of 7,75 KW) and two solar installations with a power of 2 KW. The total installed capacity for solar power equipment will be: 0.97 MW. All installations will be built directly on the roofs and façade of private dwellings (there are no public works and those in which the economic activity takes place), up to a height of up to 3 m...

24 February 2020

18 February 2020

31 January 2020

14 January 2020