Revision history of "Continuation of measures to increase the use of RES in the municipality of Czemierniki" (Q104710)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:5916:59, 2 March 2023DG Regio talk contribs 92,806 bytes +653 Changed label, description and/or aliases in it, lv, da, sk, ro, es, ga, fi, el, sv, lt, et, hr, nl, hu, sl, pt, bg, cs, mt, de, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 11:2311:23, 27 July 2022DG Regio talk contribs 90,042 bytes +59,334 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 17,748 bytes +3,234 Created claim: summary (P836): La zone de P. dispose de 9 sièges à GCZ. La gamme P suppose l’installation de 330 pcs. col. solaire (215 pcs. — 2panel., 99 pièces. 3panel, 16 pièces. 4 panneaux — dans l’objet. privé. à Chaleur. CWU d’une capacité totale de 1,34 MW. P. prévoit également la conception et l’exécution du portail Internet, qui assurera les fonctions d’éducation, de promotion et d’offre de services en ligne. Nombre total de soufflets. Le GCZ bénéficiant des résultat...
  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 14,514 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,797 bytes +145 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,652 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 14,795 bytes +2,994 Created claim: summary (P836): The area of P. covers 9 seats. in GCZ. Scope P. assumes installation of 330 units. set of solar panels (215 pcs. — 2 panels., 99 pcs. 3 panels, 16 pcs. 4 panels- in the object. private. to warm up. CWU with a total power of 1,34 MW. P. also provides for the design and execution of the Internet portal, which will perform the functions of educator, promoc. and offer online services. Total number of bellows. The GCZ of the beneficiaries (target GRU...
  • curprev 16:4116:41, 17 October 2020DG Regio talk contribs 11,801 bytes −2,416 Removed claim: summary (P836): The area of P. comprises 9 sites in GCz. The scope of P. requires the installation of 330 units of solar glass (215 pcs. 2 panel, 99 units 3 panel, 16 units 4 of the panel. CCU with a total capacity of 1.34 MW. The website also provides for the design and implementation of the website. Total number of bellows. The beneficiaries of the implementation (GRUPA DOCELOV GROUP) will be about the results of the implementation of Ms P. 1 400 in 330 sit...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2209:22, 9 March 2020DG Regio talk contribs 12,938 bytes +2,416 Created claim: summary (P836): The area of P. comprises 9 sites in GCz. The scope of P. requires the installation of 330 units of solar glass (215 pcs. 2 panel, 99 units 3 panel, 16 units 4 of the panel. CCU with a total capacity of 1.34 MW. The website also provides for the design and implementation of the website. Total number of bellows. The beneficiaries of the implementation (GRUPA DOCELOV GROUP) will be about the results of the implementation of Ms P. 1 400 in 330 sites...

24 February 2020

18 February 2020

31 January 2020

14 January 2020