Revision history of "Installation of solar collectors in Kurów Municipality" (Q104695)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 78,172 bytes +2 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 78,170 bytes +18 Set a claim value: summary (P836): O projeto (P.) está localizado na ter. da voivodia de Lubelskie, no distrito de Puławy, no edifício Kurów (GK). A área de P. compreende 18 aldeias em GK. A Scope P. assume a instalação de 471 conjuntos coletores solares em objetos privados para a preparação de C.W.U. com uma capacidade total de 1,50 MW. P. prevê igualmente a conceção e execução de um portal em linha, que prestará serviços educativos, promocionais e em linha. O número total de habita...

7 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 11:2311:23, 27 July 2022DG Regio talk contribs 72,918 bytes +47,075 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 15,821 bytes +2,477 Created claim: summary (P836): Le projet (P.) est situé dans la voïvodie de Lubelskie, dans la région de Puławy, à Kurów (GK). La gamme P. suppose l’installation de 471 ensembles de capteurs solaires dans des installations privées pour la préparation de la C.W.U. d’une capacité totale de 1,50 MW. P. prévoit également la conception et l’exécution d’un portail en ligne, qui assurera des services éducatifs, promotionnels et en ligne. Le nombre total d’habitants du GK bénéficiant...
  • curprev 09:3709:37, 1 December 2021DG Regio talk contribs 13,344 bytes +124 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 13,659 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 13,545 bytes −114 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 13,659 bytes +2,377 Created claim: summary (P836): The project (P.) is located on the ter. of Lubelskie Voivodeship, in the Puławy district, in the Kurów (GK) building.The area of P. comprises 18 villages in GK. Scope P. assumes installation of 471 solar collector sets in private objects for preparation of C.W.U. with a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal, which will perform educational, promotional and online services. The total number of...
  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 11,282 bytes −1,948 Removed claim: summary (P836): Project (P), located in the region of Lubelskie Province, in the city of Kurów (GK), comprises 18 localities in GK. The scope of P. envisages the installation of 471 units of solar collectors in private facilities for the preparation of hot water for a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of GK (GRUPA) w...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2209:22, 9 March 2020DG Regio talk contribs 11,954 bytes +1,948 Created claim: summary (P836): Project (P), located in the region of Lubelskie Province, in the city of Kurów (GK), comprises 18 localities in GK. The scope of P. envisages the installation of 471 units of solar collectors in private facilities for the preparation of hot water for a total capacity of 1.50 MW. P. also provides for the design and execution of an online portal that will serve as educational, promotional and online services. The total population of GK (GRUPA) wit...

24 February 2020

18 February 2020

31 January 2020

14 January 2020