Revision history of "Increasing the use of renewable energy sources in Lubelskie voivodship – supply and assembly of solar collectors and biomass kilns in real estate located in the area of Batorz – Stage II" (Q104677)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 94,707 bytes −6 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 94,713 bytes +84 Set a claim value: summary (P836): O projecto (P.) pressupõe a instalação de 174 painéis solares. (42 peças com 2100 watts cada, 75pcs. — 3150 W e 57 peças-4200 W) plantadas exclusivamente em telhados ou fachadas e 49 caldeiras a biomassa (17 de 20 kW cada para péletes, 4 a 24 kW por pélete, 22 a 22 kW por madeira, 6 a 20 kW por aveia) no objeto. UTC com uma potência total de 1,60 MW. P. também fornece um serviço web (TIC, ICT)., Serviço de Desenvolvimento. SW, Dokum. tech., Service...

23 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 92,232 bytes −451 Changed label, description and/or aliases in da, it, sk, pt, hr, ga, et, fi, lv, fr, bg, lt, ro, sv, es, hu, mt, sl, el, de, cs, nl, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 12:5012:50, 2 July 2022DG Regio talk contribs 90,573 bytes +59,316 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 17,990 bytes +3,206 Created claim: summary (P836): Le projet (P.) suppose l’installation de 174 pièces. ensemble de bobines solaires. (42pcs avec une puissance de 2100 W chacun, 75pcs. — 3150 W et 57pcs-4200 W) situés exclusivement sur des toits ou des façades et 49 chaudières à biomasse (17 d’une puissance de 20 kW chacun par pellet, 4 par 24 kW par pellet, 22 chacun 22 kW pour le bois, 620 kW par avoine) dans l’objet. CWU d’une capacité totale de 1,60 MW. P. propose également un site Web (TIC,...
  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 14,784 bytes +316 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 14,907 bytes +250 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 14,657 bytes −274 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 14,931 bytes +2,832 Created claim: summary (P836): The project (P.) assumes installation of 174 solar panels. (42 pieces with 2100 watts each, 75pcs. — 3150 W and 57 pieces-4200 W) planted exclusively on roofs or facades and 49 biomass boilers (17 of 20 kW each for pellets, 4 to 24 kW per pellet, 22 to 22 kW per wood, 6 to 20 kW per oats) in the object. CWU with a total power of 1,60 MW. P. also provides a web service (ICT, ICT)., Development Service. SW, Dokum. tech., Service Manager P., Person...
  • curprev 16:4016:40, 17 October 2020DG Regio talk contribs 12,099 bytes −2,354 Removed claim: summary (P836): The project (P) assumes that 174 units should be installed. (42 units of 2100W each, 75 kg. 3150W, 57W and 4200W) posited only on rooftops or elevers and 49 biomass boilers (17 with a power of 20 kW each on pellets, 4 after 24 kW to take wood, 22 after 22 kW for wood, 6 at 20 kW/oats) for wood in the wayside. CCU with a total capacity of 1.60 MW. It also provides for a website (ICT, ICT) service, a work service. Sw, Service to doum.tech., Serv...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2209:22, 9 March 2020DG Regio talk contribs 13,170 bytes +2,354 Created claim: summary (P836): The project (P) assumes that 174 units should be installed. (42 units of 2100W each, 75 kg. 3150W, 57W and 4200W) posited only on rooftops or elevers and 49 biomass boilers (17 with a power of 20 kW each on pellets, 4 after 24 kW to take wood, 22 after 22 kW for wood, 6 at 20 kW/oats) for wood in the wayside. CCU with a total capacity of 1.60 MW. It also provides for a website (ICT, ICT) service, a work service. Sw, Service to doum.tech., Servic...

24 February 2020

18 February 2020

31 January 2020

14 January 2020