Revision history of "Installation of solar collectors and biomass-fired boilers in Radecznica" (Q104651)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 92,264 bytes −9 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 92,273 bytes −7 Set a claim value: summary (P836): O projeto (P.) situar-se-á em Ter. Lubel., no distrito de Zamość, em Radecznica (GW). A área de P. abrange 19 lugares na GR. Scope P. assume a instalação de 558 unidades. [~1,7088 MW] em objeto. privado para aquecer. CWU e 75 unidades de CO para biomassa [~1,6550 MW] com uma capacidade total de 3,3636 MW. A P. prevê também o projeto e a execução do portal da Internet, que desempenhará as funções de educar, promover e oferecer serviços online. Número...

22 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 89,883 bytes +1,690 Changed label, description and/or aliases in da, sk, cs, es, sv, lv, et, lt, bg, ga, fi, nl, ro, hr, fr, pt, el, mt, sl, hu, and other parts

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 12:4912:49, 2 July 2022DG Regio talk contribs 86,075 bytes +56,271 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 17,408 bytes +3,141 Created claim: summary (P836): Le projet (P.) sera situé à Lubel. Voïvodie, dans la région de Zamájski, à Radecznica (GW). La zone P comprend 19 sièges en GR. La gamme P comprend l’installation de 558 ensembles de sel col. [~1,7088 MW] dans l’objet. CWU et 75 poêles au CO par biomasse [~1,6550 MW] d’une capacité totale de 3,3636 MW. P. a également prévu la conception et l’exécution du portail Internet, qui assurera les fonctions d’éducation, de promotion et d’offre de service...
  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 14,267 bytes +152 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 14,554 bytes +131 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 14,423 bytes −148 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 14,571 bytes +2,880 Created claim: summary (P836): The project (P.) will be located on Ter. Lubel., in the Zamość district, in Radecznica (GW).The area of P. covers 19 seats in GR. Scope P. assumes the installation of 558 units. [~1,7088 MW] in object. private to warm. CWU and 75 units of CO for biomass [~1,6550 MW] with a total capacity of 3,3636 MW. P. predicts also the project and execution of the internet portal, which will perform the functions of educating, promoc. and offer online service...
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 11,691 bytes −2,157 Removed claim: summary (P836): The project (P) will be located in the ter. region of the lubel province. [~ 1.7088 MW] on the promised privacy. CWU and 75 biomass biomass furnaces [~ 1.6550 MW] with a cumulative total capacity of 3.3636 MW. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GR. Objective.) with implementation effects. The envelope will amoun...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2409:24, 9 March 2020DG Regio talk contribs 12,564 bytes +2,157 Created claim: summary (P836): The project (P) will be located in the ter. region of the lubel province. [~ 1.7088 MW] on the promised privacy. CWU and 75 biomass biomass furnaces [~ 1.6550 MW] with a cumulative total capacity of 3.3636 MW. It will also be designed and implemented on the Internet, which will serve as a function of education and training, as well as online services. Total number of bellows. GR. Objective.) with implementation effects. The envelope will amount...

24 February 2020

18 February 2020

31 January 2020

14 January 2020