Revision history of "ECO ENERGY IN THE MUNICIPALITY OF TUROBIN" (Q104647)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 89,460 bytes +4 Changed label, description and/or aliases in pt
  • curprev 15:5815:58, 10 October 2024DG Regio talk contribs 89,456 bytes +46 Set a claim value: summary (P836): O projecto (P.) tem 24 lugares no GT. Escopo P. assume a instalação de 467 conjuntos de sais e 25 fornos de bioma no objeto. privado. para aquecimento. UTC com uma potência total de 2,04 MW. P. prevê também o projecto. e execução do portal da Internet, que irá desempenhar as funções de educador, promoc. e oferecer serviços online. Número total de foles. O GT usa-o. (alvo GRUPA) com os efeitos das implementações. O P. vai ficar bem. 1 968 em 492 suje...

20 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

27 October 2022

26 October 2022

20 October 2022

2 July 2022

  • curprev 12:4912:49, 2 July 2022DG Regio talk contribs 84,092 bytes +55,056 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 17,057 bytes +3,006 Created claim: summary (P836): Le projet (P.) couvre 24 sièges en GT. La gamme P. suppose l’installation de 467 pcs. set. col. sel. et 25 fours pour le bioma dans l’objet. privé. à Chaleur. CWU d’une capacité totale de 2,04 MW. P. a également prévu la conception et l’exécution du portail Internet, qui assurera les fonctions d’éducation, de promotion et d’offre de services en ligne. Nombre total de soufflets. Avantages GT. (Groupe DOCELOWA) avec des effets réalisés. P. sera en...
  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 14,051 bytes +105 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 14,385 bytes +100 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 14,285 bytes −103 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 14,388 bytes +2,798 Created claim: summary (P836): The project (P.) has 24 seats in the GT. Scope P. assumes installation of 467 sets of salts and 25 bioma kilns in the object. private. for heating. CWU with a total power of 2,04 MW. P. predicts also the project. and execution of the Internet portal, which will perform the functions of educator, promoc. and offer online services. Total number of bellows. GT use it. (target GRUPA) with the effects of implementations. P. is going to be ok. 1 968 i...
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 11,590 bytes −2,104 Removed claim: summary (P836): The project (P) comprises 24 sites in GT. The scope of P. requires the installation of 467 units of a saline flask and 25 bioma furnaces. CCU with a total capacity of 2.04 MW. It will also be designed and implemented on the internet. Total number of bellows. GT use. (DOCELOWA group) on the effects of implementation. Ms P. will be around 1 968 in 492 site. Installations which have been owned for 5 years throughout their life (s). GT was placed...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2409:24, 9 March 2020DG Regio talk contribs 12,417 bytes +2,104 Created claim: summary (P836): The project (P) comprises 24 sites in GT. The scope of P. requires the installation of 467 units of a saline flask and 25 bioma furnaces. CCU with a total capacity of 2.04 MW. It will also be designed and implemented on the internet. Total number of bellows. GT use. (DOCELOWA group) on the effects of implementation. Ms P. will be around 1 968 in 492 site. Installations which have been owned for 5 years throughout their life (s). GT was placed on...

24 February 2020

18 February 2020

31 January 2020

14 January 2020