Revision history of "Installation of RES-E installations in residential buildings in the Cyców commune" (Q104646)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 80,747 bytes +3 Changed label, description and/or aliases in pt
  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 80,744 bytes −13 Set a claim value: summary (P836): Este projeto inclui a instalação de 49 coletores solares com uma potência de 3,3 kW, 17 caldeiras de biomassa de 25 kW e 29 bombas de calor de ar de 3 kW no município de Cyców. O principal objetivo do projeto é proteger e melhorar o ambiente, melhorar a qualidade e as condições de vida dos residentes e aumentar a atratividade do município de Cyców através da utilização de infraestruturas de energias renováveis. Principais resultados do projeto (medi...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:3916:39, 2 March 2023DG Regio talk contribs 78,360 bytes +20 Changed label, description and/or aliases in it, da, lv, fi, sk, bg, cs, fr, pt, hu, mt, ro, lt, sv, ga, et, nl, de, es, sl, el, hr, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 11:2211:22, 27 July 2022DG Regio talk contribs 76,224 bytes +48,844 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 16,446 bytes +2,841 Created claim: summary (P836): Ce projet comprend l’installation de 49 capteurs solaires d’une puissance de 3,3 kW, de 17 chaudières à biomasse d’une puissance de 25 kW et de 29 pompes à chaleur à air d’une puissance de 3 kW à Cyca Commune. L’objectif principal du projet est de protéger et d’améliorer l’environnement, d’améliorer la qualité et les conditions de vie des habitants et d’accroître l’attractivité de la municipalité de Cyców grâce à l’utilisation d’infrastructures...
  • curprev 09:3509:35, 1 December 2021DG Regio talk contribs 13,605 bytes +172 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 13,872 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 13,731 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 13,880 bytes +2,401 Created claim: summary (P836): This project includes the installation of 49 solar collectors with a power of 3.3 kW, 17 biomass boilers of 25 kW and 29 air heat pumps of 3 kW in the municipality of Cyców. The main objective of the project is to protect and improve the environment, improve the quality and living conditions of residents and increase the attractiveness of the municipality of Cyców through the use of renewable energy infrastructure. Key project results (measured...
  • curprev 16:3916:39, 17 October 2020DG Regio talk contribs 11,479 bytes −1,928 Removed claim: summary (P836): This project includes the installation of 49 solar collectors with a power output of 3.3 kW, 17 biomass boilers up to 25 kW and 29 air heat pumps with a power of 3 kW in the municipality of Cyclists. The aim of the project is to protect and improve the natural environment, to improve the quality and living conditions of the inhabitants and to increase the attractiveness of the municipality of Cyclists through the use of infrastructure using re...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2409:24, 9 March 2020DG Regio talk contribs 12,124 bytes +1,928 Created claim: summary (P836): This project includes the installation of 49 solar collectors with a power output of 3.3 kW, 17 biomass boilers up to 25 kW and 29 air heat pumps with a power of 3 kW in the municipality of Cyclists. The aim of the project is to protect and improve the natural environment, to improve the quality and living conditions of the inhabitants and to increase the attractiveness of the municipality of Cyclists through the use of infrastructure using rene...

24 February 2020

18 February 2020

31 January 2020

14 January 2020