Revision history of "INSTALLATION OF SOLAR COLLECTORS AND C.O. BIOMASS-FIRED BOILERS IN THE MUNICIPALITY OF DZWOLA" (Q104640)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

3 March 2023

  • curprev 00:0100:01, 3 March 2023DG Regio talk contribs 90,659 bytes −793 Changed label, description and/or aliases in da, it, sk, fi, ga, hu, de, pt, bg, sv, et, ro, mt, hr, sl, el, cs, lt, fr, es, nl, lv, and other parts

27 October 2022

26 October 2022

20 October 2022

27 July 2022

  • curprev 11:2211:22, 27 July 2022DG Regio talk contribs 89,343 bytes +58,845 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3009:30, 1 December 2021DG Regio talk contribs 17,667 bytes +3,157 Created claim: summary (P836): La zone de P. comprend 17 sièges. La gamme P suppose l’installation de 429 pcs. set. col. sel.(258 pcs. 2 panneaux et 171 3 panneaux) situés exclusivement sur des toits ou des façades et 81 chaudières bioma (10pcs-15 kW, 24pcs-20 kW, 32pcs-25 kW 9pcs-30 kW et 6pcs-35 kW) dans l’objet. CWU d’une capacité totale de 3,22712 MW (1,32 MW de collecteurs et 1,91 MW de fours). P. a également prévu la conception et l’exécution du portail Internet, qui as...
  • curprev 09:3009:30, 1 December 2021DG Regio talk contribs 14,510 bytes +160 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:2516:25, 17 October 2020DG Regio talk contribs 14,789 bytes +152 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:2516:25, 17 October 2020DG Regio talk contribs 14,637 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:2516:25, 17 October 2020DG Regio talk contribs 14,782 bytes +2,987 Created claim: summary (P836): The area of P. comprises 17 places. Scope P. assumes installation of 429 sets of salts (258 pcs. 2-panel and 171 3-panel) planted exclusively on roofs or facades and 81 bioma boilers (10 pieces-15 kW, 24pcs-20 kW, 32pcs-25 kW 9pcs-30 kW and 6pcs.-35 kW) in the object. CWU with a total power of 3,22712 MW (1,32 MW collectors and 1,91 MW furnaces). P. predicts also the project. and execution of the Internet portal, which will perform the functions...
  • curprev 16:2516:25, 17 October 2020DG Regio talk contribs 11,795 bytes −2,252 Removed claim: summary (P836): The area of P. comprises 17 sites in the MD. The scope of P. requires the installation of 429 units. 2-panel and 171 3-panel) posited only on rooftops or elevations and 81 boilers on a bit (10th.-15 kW, 24th.-20 kW, 32th.-25 kW 9th.-30 kW and 6-35 kW) for the obverse. CWU 3.22712 MW (1.32 MW collector and 1.91 MW furnaces). It will also be designed and implemented on the internet. Total. MD. use of the advantage. (DOCELOWA group) on the effect...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2309:23, 9 March 2020DG Regio talk contribs 12,770 bytes +2,252 Created claim: summary (P836): The area of P. comprises 17 sites in the MD. The scope of P. requires the installation of 429 units. 2-panel and 171 3-panel) posited only on rooftops or elevations and 81 boilers on a bit (10th.-15 kW, 24th.-20 kW, 32th.-25 kW 9th.-30 kW and 6-35 kW) for the obverse. CWU 3.22712 MW (1.32 MW collector and 1.91 MW furnaces). It will also be designed and implemented on the internet. Total. MD. use of the advantage. (DOCELOWA group) on the effects...

24 February 2020

18 February 2020

31 January 2020

14 January 2020