Revision history of "RECONSTRUCTION OF THE BUILDING AT UL. LUTOMIERSKIE 4 IN KONSTANTYNÓW ŁÓDZKIE FOR THE OPERATION OF PRESCHOOL BRANCHES" (Q102353)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:4603:46, 11 October 2024DG Regio talk contribs 89,697 bytes −14 Changed label, description and/or aliases in pt
  • curprev 03:4603:46, 11 October 2024DG Regio talk contribs 89,711 bytes +14 Set a claim value: summary (P836): O tema do projeto é a reconstrução do edifício na rua. Lutomierska 4 para a operação de 4 filiais pré-escolares. Trata-se de um edifício no qual até junho de 2016 se localizava o SP. N.o 2, que desde 1 de setembro de 2016 tem a sua sede social em ul. Kilinski 75 anos. Desde 1 de setembro de 2016, foram criados dois grupos pré-escolares no âmbito do projeto «Os nossos pequenos jardins de infância», cofinanciados ao abrigo da medida 11.1.1. por fundos...

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1019:10, 2 March 2023DG Regio talk contribs 86,162 bytes −600 Changed label, description and/or aliases in lv, da, it, sk, ga, fi, sl, et, ro, hr, el, cs, sv, lt, fr, pt, hu, nl, es, de, bg, mt, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 12:0412:04, 2 July 2022DG Regio talk contribs 85,093 bytes +54,683 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 18,375 bytes +2,974 Created claim: summary (P836): L’objet du projet est la reconstruction du bâtiment à ul. Lutomierska 4 pour le fonctionnement de 4 unités préscolaires. C’est le bâtiment dans lequel était logé jusqu’en juin 2016 SP. No 2, qui, depuis le 1er septembre 2016, a son siège social à ul. Kilińskiego 75. Depuis le 01.09.2016, il y a deux groupes préscolaires dans le bâtiment mis en place dans le cadre du projet «Nos petits jardins d’enfants» cofinancé au titre de la mesure 11.1.1. pa...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 15,401 bytes +184 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:3714:37, 17 October 2020DG Regio talk contribs 15,656 bytes +179 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3714:37, 17 October 2020DG Regio talk contribs 15,477 bytes −160 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3714:37, 17 October 2020DG Regio talk contribs 15,637 bytes +2,799 Created claim: summary (P836): The subject of the project is the reconstruction of the building on the street. Lutomierska 4 for the operation of 4 preschool branches. It is a building in which until June 2016, the SP was located. No. 2, which since 1 September 2016 has its registered office on ul. Kilinski 75. Since 01.09.2016, there have been 2 preschool groups established within the framework of the project “Our small kindergartens” co-financed under measure 11.1.1. from E...
  • curprev 14:3714:37, 17 October 2020DG Regio talk contribs 12,838 bytes −2,290 Removed claim: summary (P836): The object of the project is to rebuild the building at ul. 4 for the operation of 4 pre-school branches. It is a building in which SP was located until June 2016. No 2, which has been located on ul. Kilińskiego 75. Since 01.09.2016, there have been 2 pre-primary groups in the building, set up as part of the project ‘Our small kindergartens school’ co-financed under Action 11.1.1. from ESF funds from ROP WBL 2014-2020 (proj. No RPLD.11.01.01-1...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0010:00, 6 March 2020DG Regio talk contribs 13,407 bytes +2,290 Created claim: summary (P836): The object of the project is to rebuild the building at ul. 4 for the operation of 4 pre-school branches. It is a building in which SP was located until June 2016. No 2, which has been located on ul. Kilińskiego 75. Since 01.09.2016, there have been 2 pre-primary groups in the building, set up as part of the project ‘Our small kindergartens school’ co-financed under Action 11.1.1. from ESF funds from ROP WBL 2014-2020 (proj. No RPLD.11.01.01-10-...

24 February 2020

18 February 2020

31 January 2020

14 January 2020