Revision history of "MODERNISATION AND ADAPTATION OF THE PRACTICAL TRAINING CENTRE IN THE TEAM OF UPPER SECONDARY SCHOOLS NO. 3 IN TOMASZÓW MAZOWIECKI" (Q102338)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:5216:52, 2 March 2023DG Regio talk contribs 88,000 bytes +1,101 Changed label, description and/or aliases in lv, it, da, sk, sl, pt, fi, et, de, hu, sv, ro, fr, bg, nl, lt, mt, hr, cs, ga, es, el, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 12:0312:03, 2 July 2022DG Regio talk contribs 85,236 bytes +54,690 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 18,297 bytes +3,007 Created claim: summary (P836): L’OBJET DU PROJET EST D’INVESTIR DANS LA MODERNISATION ET L’ADAPTATION DE 2 BÂTIMENTS DE LA ZSP NO 3 À TOMASZÓW MAZ.-GŁÓWNEGO CKP BÂTIMENT ET BÂTIMENT H, VISANT À CRÉER UN SEUL, PROFESSIONNELLEMENT ÉQUIPÉ ET ADAPTÉ AUX BESOINS DES DIFFÉRENTS DESTINATAIRES, QUI REMPLIRAIT LE RÔLE DU CENTRE DE DISTRICT POUR LA FORMATION PROFESSIONNELLE PRATIQUE ET CONTINUE, AINSI QUE D’UN CENTRE D’EXAMEN. LES TRAVAUX DE CONSTRUCTION PRÉVUS DANS LE PROJET VISENT À...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 15,290 bytes +206 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:3414:34, 17 October 2020DG Regio talk contribs 15,523 bytes +190 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3414:34, 17 October 2020DG Regio talk contribs 15,333 bytes −188 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3414:34, 17 October 2020DG Regio talk contribs 15,521 bytes +2,689 Created claim: summary (P836): THE SUBJECT OF THE PROJECT IS AN INVESTMENT CONSISTING OF MODERNISATION AND ADAPTATION OF 2 BUILDINGS OF ZSP NO. 3 IN TOMASZÓW MAZ.-GŁÓWNEGO BUILDING CKP AND H BUILDING, AIMING TO CREATE ONE, PROFESSIONALLY EQUIPPED AND TAILORED TO THE NEEDS OF VARIOUS ADDRESSEES, WHICH WOULD FULFIL THE ROLE OF A DISTRICT VOCATIONAL TRAINING CENTRE FOR PRACTICAL AND CONTINUOUS TRAINING, AS WELL AS AN EXAMINATION CENTRE. THE CONSTRUCTION WORK PLANNED IN THE PROJE...
  • curprev 14:3414:34, 17 October 2020DG Regio talk contribs 12,832 bytes −2,190 Removed claim: summary (P836): THE PROJECT CONSISTS OF AN INVESTMENT IN THE MODERNISATION AND ADAPTATION OF 2 ZSP 3 BUILDINGS IN TOMASZÓW MAZ-MECH-MAIN BUILDING AND THE H BUILDING, AIMING AT THE CREATION OF ONE, PROFESSIONALLY EQUIPPED AND TAILORED TO THE NEEDS OF THE VARIOUS ADDRESSEES, WHICH WOULD FULFIL THE ROLE OF THE DISTRICT CENTRE FOR VOCATIONAL AND CONTINUING TRAINING, AS WELL AS THE TEST CENTRE, IN THE DISTRICT. THE CONSTRUCTION WORKS PLANNED IN THE PROJECT AIM TO...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0010:00, 6 March 2020DG Regio talk contribs 13,303 bytes +2,190 Created claim: summary (P836): THE PROJECT CONSISTS OF AN INVESTMENT IN THE MODERNISATION AND ADAPTATION OF 2 ZSP 3 BUILDINGS IN TOMASZÓW MAZ-MECH-MAIN BUILDING AND THE H BUILDING, AIMING AT THE CREATION OF ONE, PROFESSIONALLY EQUIPPED AND TAILORED TO THE NEEDS OF THE VARIOUS ADDRESSEES, WHICH WOULD FULFIL THE ROLE OF THE DISTRICT CENTRE FOR VOCATIONAL AND CONTINUING TRAINING, AS WELL AS THE TEST CENTRE, IN THE DISTRICT. THE CONSTRUCTION WORKS PLANNED IN THE PROJECT AIM TO CR...

24 February 2020

18 February 2020

31 January 2020

14 January 2020