Revision history of "Energy, nature and tradition – on the Belchatov trail" (Q102165)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 90,918 bytes +4 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 90,914 bytes −57 Set a claim value: summary (P836): O projeto inclui 1-desenvolvimento de documentação de aplicação: Estudo de viabilidade + Pedido + Plano de desenvolvimento turístico, 2 desenvolvimento de documentação técnica – macieira, 3 trabalhos preparatórios de macieira Sad, 4 – construção de pomar de macieiras fase I, 5 – construção de pomar de macieiras fase II, 6 – adaptação dos peões às necessidades das pessoas com deficiência, 7 – criação de novos trilhos pedestres, 8 – fornecimento de au...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0819:08, 2 March 2023DG Regio talk contribs 87,436 bytes +3,090 Changed label, description and/or aliases in lv, it, da, sk, ro, fr, sv, fi, hr, sl, et, ga, de, hu, lt, bg, pt, nl, es, mt, el, cs, and other parts

19 October 2022

2 July 2022

  • curprev 12:0012:00, 2 July 2022DG Regio talk contribs 83,530 bytes +53,018 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:0309:03, 1 December 2021DG Regio talk contribs 18,148 bytes +3,106 Created claim: summary (P836): Le projet comprend 1-élaboration de la documentation d’application: Etude de faisabilité +Conclusion +Plan de Développement du Tourisme, 2-Développement de la documentation technique — Pomme Sad, 3 Travaux Préparatifs Sad, 4 — Construction d’un verger de pommes étape I, 5-construction de pommiers étape II, 6-adaptation des passages piétonniers aux besoins des personnes handicapées, 7-création de nouveaux sentiers de randonnée, 8-fourniture d’aud...
  • curprev 09:0309:03, 1 December 2021DG Regio talk contribs 15,042 bytes +118 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:3400:34, 16 October 2020DG Regio talk contribs 15,363 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:3400:34, 16 October 2020DG Regio talk contribs 15,249 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:3400:34, 16 October 2020DG Regio talk contribs 15,366 bytes +2,642 Created claim: summary (P836): The project includes 1-development of application documentation: Feasibility study +Application +Tourist Development Plan, 2-development of technical documentation – apple garden, 3-preparatory work of apple Sad, 4– construction of apple orchard stage I, 5-building of apple orchard stage II, 6-adaptation of pedestrians to the needs of disabled people, 7-creation of new hiking trails, 8-supply of audio guides with tour scenario, 9-small architect...
  • curprev 00:3400:34, 16 October 2020DG Regio talk contribs 12,724 bytes −2,284 Removed claim: summary (P836): The project includes 1-development of application documentation: Feasibility study + Application + Plan for Tourism Development, 2-development of technical documentation — Sad, 3 — construction of the apple axis Sad, 4 — construction of a jacketed phase I, 5-construction of a jacketed phase II, 6-adaptation of pedestrian crossings to the needs of disabled persons, 7 — creation of new tourist routes, 8-supply of audio guides in the tour operato...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:5509:55, 6 March 2020DG Regio talk contribs 13,285 bytes +2,284 Created claim: summary (P836): The project includes 1-development of application documentation: Feasibility study + Application + Plan for Tourism Development, 2-development of technical documentation — Sad, 3 — construction of the apple axis Sad, 4 — construction of a jacketed phase I, 5-construction of a jacketed phase II, 6-adaptation of pedestrian crossings to the needs of disabled persons, 7 — creation of new tourist routes, 8-supply of audio guides in the tour operator,...

24 February 2020

18 February 2020

31 January 2020

14 January 2020