Revision history of "ORDERING WATER AND SEWAGE MANAGEMENT IN THE MUNICIPALITY OF ANDRESPOL" (Q102056)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 80,943 bytes −7 Changed label, description and/or aliases in pt
  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 80,950 bytes −48 Set a claim value: summary (P836): O objetivo direto do projeto é reduzir a contaminação das águas subterrâneas e superficiais por efluentes na aglomeração de Andrespol, aumentando o nível de equipamento da zona da aglomeração com infraestruturas técnicas básicas e melhorando o acesso dos residentes a essas infraestruturas. Em resultado do projeto, será construído um total de 13,41 km de rede de esgotos, o que permitirá o acesso a um melhor tratamento de esgotos para 1 612 clientes:...

12 March 2024

13 December 2023

6 July 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:3121:31, 2 March 2023DG Regio talk contribs 78,546 bytes −141 Changed label, description and/or aliases in it, da, sk, fr, fi, lv, hr, sv, el, ga, ro, bg, hu, de, et, cs, pt, sl, mt, es, and other parts

27 October 2022

26 October 2022

19 October 2022

27 July 2022

  • curprev 10:5710:57, 27 July 2022DG Regio talk contribs 76,606 bytes +48,900 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:0409:04, 1 December 2021DG Regio talk contribs 16,450 bytes +2,786 Created claim: summary (P836): L’objectif direct du projet est de réduire la contamination des eaux souterraines et des eaux de surface par les eaux usées produites dans l’agglomération d’Andrespol en augmentant le niveau d’équipement de l’agglomération en infrastructures techniques de base et en améliorant l’accès des résidents à cette infrastructure. Grâce au projet, un total de 13,41 km de réseau d’assainissement sera construit, ce qui permettra d’améliorer le traitement d...
  • curprev 09:0409:04, 1 December 2021DG Regio talk contribs 13,664 bytes +145 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:2300:23, 16 October 2020DG Regio talk contribs 13,958 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:2300:23, 16 October 2020DG Regio talk contribs 13,830 bytes −122 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:2300:23, 16 October 2020DG Regio talk contribs 13,952 bytes +2,479 Created claim: summary (P836): The direct objective of the project is to reduce the contamination of groundwater and surface water by effluents in the Andrespol Agglomeration by increasing the level of equipment of the agglomeration area with basic technical infrastructure and improving residents’ access to this infrastructure. As a result of the project, a total of 13.41 km of sewage network will be built, which will allow access to improved sewage treatment for 1 612 custom...
  • curprev 00:2300:23, 16 October 2020DG Regio talk contribs 11,473 bytes −1,921 Removed claim: summary (P836): The direct objective of the project is to limit the contamination of groundwater and surface water from the waste waters of the agglomeration of Andrepol by increasing the level of equipment of the area of the agglomeration into the basic technical infrastructure and improving the access of the inhabitants to the infrastructure. As a result of the project, a total of 13.41 km of sewerage network will be constructed to allow access to improved...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:4509:45, 6 March 2020DG Regio talk contribs 12,110 bytes +1,921 Created claim: summary (P836): The direct objective of the project is to limit the contamination of groundwater and surface water from the waste waters of the agglomeration of Andrepol by increasing the level of equipment of the area of the agglomeration into the basic technical infrastructure and improving the access of the inhabitants to the infrastructure. As a result of the project, a total of 13.41 km of sewerage network will be constructed to allow access to improved wa...

24 February 2020

18 February 2020

31 January 2020

14 January 2020