Revision history of "EXPANSION OF THE DISTRICT HEATING SYSTEM IN DASZYNA" (Q102029)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 87,371 bytes +4 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 87,367 bytes +126 Set a claim value: summary (P836): Investidor e principal beneficiário – município de Daszyna. Os beneficiários finais são residentes do município. O objetivo direto do projeto – minimizar a procura de energia primária através da redução das perdas de calor no sistema, do aumento da sua eficiência e da substituição de fontes de energia individuais por redes de aquecimento, evitando assim o consumo de combustíveis convencionais e reduzindo as emissões de poluentes atmosféricos respons...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

19 October 2022

27 July 2022

  • curprev 10:5710:57, 27 July 2022DG Regio talk contribs 86,847 bytes +55,681 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 18,535 bytes +3,338 Created claim: summary (P836): Investisseur et bénéficiaire principal — municipalité de Daszyna. Bénéficiaires finaux — résidents de la municipalité. L’objectif direct du projet est de réduire au minimum la demande d’énergie primaire en réduisant les pertes de chaleur dans le système, en augmentant son efficacité et en remplaçant les différentes sources d’énergie par le chauffage urbain, évitant ainsi la consommation de combustibles classiques et réduisant les émissions de po...
  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 15,197 bytes +111 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:0816:08, 17 October 2020DG Regio talk contribs 15,525 bytes +110 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0816:08, 17 October 2020DG Regio talk contribs 15,415 bytes −137 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0816:08, 17 October 2020DG Regio talk contribs 15,552 bytes +2,802 Created claim: summary (P836): Investor and Main Beneficiary – Daszyna Municipality. The final beneficiaries are residents of the municipality. The project’s direct objective – minimising primary energy demand by reducing heat losses in the system, increasing its efficiency and replacing individual energy sources with heating networks, thus avoiding the consumption of conventional fuels and reducing emissions of air pollutants responsible for low emissions and greenhouse gas...
  • curprev 16:0816:08, 17 October 2020DG Regio talk contribs 12,750 bytes −2,343 Removed claim: summary (P836): Investor and principal beneficiary Gmina Druszyn. The final beneficiaries are the inhabitants of the municipality. The direct objective of the project — minimising the demand for primary energy by reducing heat losses in the system, increasing its efficiency and replacing individual sources of power supply from the district heating network, thus avoiding the use of conventional fuels and reducing the emissions of air pollutants responsible for...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:4409:44, 6 March 2020DG Regio talk contribs 13,379 bytes +2,343 Created claim: summary (P836): Investor and principal beneficiary Gmina Druszyn. The final beneficiaries are the inhabitants of the municipality. The direct objective of the project — minimising the demand for primary energy by reducing heat losses in the system, increasing its efficiency and replacing individual sources of power supply from the district heating network, thus avoiding the use of conventional fuels and reducing the emissions of air pollutants responsible for l...

24 February 2020

18 February 2020

31 January 2020

14 January 2020