Revision history of "CONSTRUCTION OF A PUBLIC KINDERGARTEN IN LIPCE REYMONTOWSKIE IN PASSIVE TECHNOLOGY" (Q101999)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 89,854 bytes −7 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 89,861 bytes +23 Set a claim value: summary (P836): A principal razão para o projeto é a escassez de infraestruturas municipais de ensino pré-escolar e o aumento da poluição resultante da incineração ilícita de resíduos urbanos em lareiras domésticas. Portanto, a principal mensagem de investimento é reduzir as emissões de poluentes na região. O projeto consiste na construção – em conformidade com o conceito de conceção universal – de um jardim de infância no padrão de construção passiva para 4 ramos...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0819:08, 2 March 2023DG Regio talk contribs 86,303 bytes +262 Changed label, description and/or aliases in it, sk, da, fi, sv, ga, el, lv, fr, cs, hu, sl, pt, ro, et, hr, lt, de, nl, mt, bg, es, and other parts

19 October 2022

2 July 2022

  • curprev 11:5711:57, 2 July 2022DG Regio talk contribs 85,225 bytes +54,880 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5708:57, 1 December 2021DG Regio talk contribs 18,251 bytes +3,018 Created claim: summary (P836): La principale raison de ce projet est la pénurie d’infrastructures préscolaires municipales et l’augmentation de la pollution due à l’incinération illégale des déchets municipaux dans les fours domestiques. Par conséquent, le message clé de l’investissement est de réduire les émissions de polluants dans la région. Le projet consiste à construire, conformément au concept de conception universelle, une garderie dans la norme d’un bâtiment passif p...
  • curprev 08:5708:57, 1 December 2021DG Regio talk contribs 15,233 bytes +149 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:0716:07, 17 October 2020DG Regio talk contribs 15,523 bytes +141 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:0716:07, 17 October 2020DG Regio talk contribs 15,382 bytes −140 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:0716:07, 17 October 2020DG Regio talk contribs 15,522 bytes +2,767 Created claim: summary (P836): The main reason for the project is the shortage of municipal preschool infrastructure and the increase in pollution from illicit incineration of municipal waste in household fireplaces. Therefore, the main message of investment is to reduce pollutant emissions in the region. The project consists of building – in accordance with the concept of universal design – a kindergarten facility in the passive building standard for 4 branches of 25 childre...
  • curprev 16:0716:07, 17 October 2020DG Regio talk contribs 12,755 bytes −2,289 Removed claim: summary (P836): The main reason for the project is the shortage of municipal pre-school infrastructure and the increase in pollution from the illegal incineration of municipal waste in domestic furnaces. Therefore, the main message of the investment is to reduce emissions of pollutants in the region. The project consists of the construction, in accordance with the concept of universal design, of a pre-school facility in a passive house standard for 4 branches...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:4409:44, 6 March 2020DG Regio talk contribs 13,329 bytes +2,289 Created claim: summary (P836): The main reason for the project is the shortage of municipal pre-school infrastructure and the increase in pollution from the illegal incineration of municipal waste in domestic furnaces. Therefore, the main message of the investment is to reduce emissions of pollutants in the region. The project consists of the construction, in accordance with the concept of universal design, of a pre-school facility in a passive house standard for 4 branches o...

24 February 2020

18 February 2020

31 January 2020

14 January 2020