Revision history of "Thermal modernisation of public buildings (e.g. schools, kindergartens, offices) in the City of Głowna" (Q101888)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

19 October 2022

2 July 2022

  • curprev 11:5411:54, 2 July 2022DG Regio talk contribs 86,230 bytes +55,123 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:4908:49, 1 December 2021DG Regio talk contribs 18,467 bytes +3,222 Created claim: summary (P836): Le projet prévoyait la modernisation thermique des bâtiments publics głownie, i.e. École primaire no 2 et salle des sports à l’école primaire no 2 à Głowno. Le bâtiment scolaire fait l’objet d’une thermomodernisation et d’une rénovation du toit, des murs et des plafonds suspendus de niveau 0, endommagés à la suite de fuites de puits de lumière et de fuites du toit. La thermomodernisation du bâtiment scolaire consiste à réchauffer les murs, les c...
  • curprev 08:4908:49, 1 December 2021DG Regio talk contribs 15,245 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:5315:53, 17 October 2020DG Regio talk contribs 15,517 bytes +163 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5315:53, 17 October 2020DG Regio talk contribs 15,354 bytes −163 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 15,517 bytes +2,732 Created claim: summary (P836): The project envisages the thermal modernisation of public buildings, i.e. Primary School No. 2 and Sports Hall at Primary School No. 2 in Głowno. The school is undergoing thermal modernisation and renovation of the roof, walls and suspended ceilings of level 0, damaged by leakage of fireflies and leakage of the roof roof. As part of the thermo-modernisation of the school’s building, it is assumed to warm the walls, frames, foundation pedestals,...
  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 12,785 bytes −2,274 Removed claim: summary (P836): The project provides for the thermal modernisation of the public buildings of Głowno, i.e. Primary School No 2 and sports hall at Primary School No 2 in Głownie. The school building is subject to thermal refurbishment and renovation of the roof, wall and ceiling walls 0, damaged by leakage of skylights and roof of roof. The thermal modernisation of a school building involves warming up walls, frames, floor walls, floor walls, replacement and i...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:2609:26, 6 March 2020DG Regio talk contribs 13,350 bytes +2,274 Created claim: summary (P836): The project provides for the thermal modernisation of the public buildings of Głowno, i.e. Primary School No 2 and sports hall at Primary School No 2 in Głownie. The school building is subject to thermal refurbishment and renovation of the roof, wall and ceiling walls 0, damaged by leakage of skylights and roof of roof. The thermal modernisation of a school building involves warming up walls, frames, floor walls, floor walls, replacement and ins...

24 February 2020

18 February 2020

31 January 2020

14 January 2020