Revision history of "RENEWABLE ENERGY INSTALLATIONS FOR RESIDENTS OF THE MUNICIPALITY INOWŁÓDZ" (Q101857)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 92,926 bytes −11 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 92,937 bytes +47 Set a claim value: summary (P836): O beneficiário do projeto é a JST-Gmina Inowłódz. O grupo-alvo são os habitantes do município e, indiretamente, do distrito de Tomaszowski. O âmbito do projeto inclui: É o rabo. 1 A preparação do projeto-comunidade suportou o custo do desenvolvimento de um estudo de viabilidade, documentação do projeto (III trimestre de 2016) Recurso. 2 Instalação de instalações fotovoltaicas – 33 instalações fotovoltaicas (23 em edifícios residenciais, 6 em terreno...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 90,857 bytes −1,135 Changed label, description and/or aliases in lv, da, sk, it, cs, fr, et, hu, el, ga, ro, fi, bg, pt, lt, sv, nl, hr, mt, es, sl, de, and other parts

19 October 2022

2 July 2022

  • curprev 11:5311:53, 2 July 2022DG Regio talk contribs 91,178 bytes +59,236 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5208:52, 1 December 2021DG Regio talk contribs 18,722 bytes +3,298 Created claim: summary (P836): Le bénéficiaire du projet est JST-municipalité d’Inowłódz. Le groupe cible est les résidents de la municipalité et indirectement du district de Tomaszowski. La portée du projet comprend: AWW. 1 Préparer le projet-municipalité a engagé les coûts de l’élaboration d’une étude de faisabilité, documentation du projet (T3 2016) Zad. 2 Installation d’installations photovoltaïques — exécution de 33 installations photovoltaïques (23 sur soufflet, 6 sur t...
  • curprev 08:5208:52, 1 December 2021DG Regio talk contribs 15,424 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 15,721 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 15,585 bytes −136 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 15,721 bytes +2,967 Created claim: summary (P836): The beneficiary of the project is JST-Gmina Inowłódz. The target group is the inhabitants of the commune and indirectly the Tomaszowski district. The scope of the project includes: It’s the ass. 1 Preparation of the project-community incurred the cost of developing a feasibility study, project documentation (III quarter 2016) Resource. 2 Installation of photovoltaic installations – 33 PV installations (23 on residential buildings, 6 on land, 4 o...
  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 12,754 bytes −2,519 Removed claim: summary (P836): The beneficiary of the project is JST-municipality. The target group is the inhabitants of the municipality and the district of the Tomaszowski district. The scope of the project includes: Task 1 Preparation of the project — the municipality incurred the costs of the feasibility study, project documentation (III Q2016) Zad. 2 installation of PV installations — performance of 33 PV installations (23 on buildings, 6 on land, 4 on land buildings)...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3209:32, 6 March 2020DG Regio talk contribs 13,550 bytes +2,519 Created claim: summary (P836): The beneficiary of the project is JST-municipality. The target group is the inhabitants of the municipality and the district of the Tomaszowski district. The scope of the project includes: Task 1 Preparation of the project — the municipality incurred the costs of the feasibility study, project documentation (III Q2016) Zad. 2 installation of PV installations — performance of 33 PV installations (23 on buildings, 6 on land, 4 on land buildings) w...

24 February 2020

18 February 2020

31 January 2020

14 January 2020