Revision history of "INVESTMENT IN INFRASTRUCTURE FOR THE PRODUCTION OF ELECTRICITY FROM RENEWABLE SOURCES IN BRENEN POLSKA" (Q101849)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 79,556 bytes +1 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 79,555 bytes +31 Set a claim value: summary (P836): O projeto Mon. «Investimento em infraestruturas para a produção de eletricidade a partir de fontes renováveis na Brenen Polska» diz respeito a investimentos na construção de instalações solares com uma capacidade máxima instalada total de 39,48 kWp. A tarefa será realizada no período de 1.2.2018 a 31.12.2018. Para realizar o investimento, é necessário adquirir no âmbito da Tarefa 1 [Construção de uma microinstalação fotovoltaica “on-Gird” com uma ca...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

19 October 2022

2 July 2022

  • curprev 11:5311:53, 2 July 2022DG Regio talk contribs 75,789 bytes +48,147 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 17,139 bytes +2,597 Created claim: summary (P836): Projet intitulé «Investissement dans les infrastructures de production d’électricité à partir de sources renouvelables à Brenen Polska» désigne un investissement dans la construction d’une installation utilisant l’énergie solaire, dont la capacité installée maximale totale sera de 39,48 kWc. L’activité se déroulera entre le 01/02/2018 et le 31.12.2018. Afin de réaliser l’investissement, il est nécessaire d’acquérir, dans le cadre de la tâche 1 [...
  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 14,542 bytes +184 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:5215:52, 17 October 2020DG Regio talk contribs 14,797 bytes +162 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 14,635 bytes −169 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 14,804 bytes +2,370 Created claim: summary (P836): Project Mon. “Investment in infrastructure for the production of electricity from renewable sources in Brenen Polska” concerns investments in the construction of solar installations with a total maximum installed capacity of 39,48 kWp. The task will be carried out in the period from 01.02.2018 to 31.12.2018. In order to carry out the investment, it is necessary to acquire within Task 1 [Construction of a photovoltaic micro-installation “on-Gird”...
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 12,434 bytes −1,902 Removed claim: summary (P836): The project entitled: “Investment in the infrastructure for the production of electricity from renewable sources at the firm Brenen Poland” refers to the investment in the construction of a solar installation, the total maximum installed capacity of which will be 39,48 kWp. The task will be carried out in the period from 01.02.2018 to 31.12.2018. In order to carry out the investment, an acquisition under Task 1 [Construction of a 39,48 kWp pho...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3109:31, 6 March 2020DG Regio talk contribs 12,611 bytes +1,902 Created claim: summary (P836): The project entitled: “Investment in the infrastructure for the production of electricity from renewable sources at the firm Brenen Poland” refers to the investment in the construction of a solar installation, the total maximum installed capacity of which will be 39,48 kWp. The task will be carried out in the period from 01.02.2018 to 31.12.2018. In order to carry out the investment, an acquisition under Task 1 [Construction of a 39,48 kWp photo...

24 February 2020

18 February 2020

31 January 2020

14 January 2020