Revision history of "CONSTRUCTION OF A BIOGAS PLANT WITH AN ELECTRICAL CAPACITY OF 0,499 MWE PRODUCED FROM AGRICULTURAL BIOGAS MADE FROM ORGANIC MATTER CONTAINED IN BIOMASS OF VARIOUS KINDS" (Q101848)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 13:1013:10, 2 March 2023DG Regio talk contribs 93,159 bytes +513 Changed label, description and/or aliases in lv, it, sv, da, ro, fr, bg, sk, ga, et, de, fi, hu, nl, sl, mt, el, hr, es, lt, pt, cs, and other parts

19 October 2022

2 July 2022

  • curprev 11:5311:53, 2 July 2022DG Regio talk contribs 91,833 bytes +59,942 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 18,805 bytes +3,140 Created claim: summary (P836): Le projet consiste en la construction d’une centrale de biogaz d’une capacité de 0,499 MW (électricité). 0,499 MWe, puissance thermique. 0,499 MW). L’usine de biogaz existante produira de l’électricité et de la chaleur par cogénération. En outre, il est envisagé d’utiliser des SER-solaires supplémentaires par le biais d’une installation photovoltaïque, ce qui portera le taux d’utilisation des SER à 0,509 MWe. Le projet permettra également le rem...
  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 15,665 bytes +259 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 15,845 bytes +228 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 15,617 bytes −219 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 15,836 bytes +2,891 Created claim: summary (P836): The project consists of the construction of a 0.499 MW biogas plant (elect power). 0.499 MWe, heat output. 0,499 MW). The established Biogas plant will generate electricity and heat in cogeneration, in addition to the use of additional RES-solar energy through a photovoltaic installation, which will increase the use of RES to 0.509 MWe. The project will also make it possible to replace conventional energy sources at ENERBIO and eliminate emissio...
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 12,945 bytes −2,453 Removed claim: summary (P836): The project involves the construction of a 0.499 MW biogas plant (power elekt). 0,499 MWe, thermal power. 0.499 MW). The established biogas plant will produce electricity and heat from cogeneration, and it is also envisaged to use an additional OE-solar power through a photovoltaic installation which will increase the use of RES to 0,509 MWe. The project will also allow the replacement of conventional energy sources by ENERBIO and the eliminat...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3109:31, 6 March 2020DG Regio talk contribs 13,673 bytes +2,453 Created claim: summary (P836): The project involves the construction of a 0.499 MW biogas plant (power elekt). 0,499 MWe, thermal power. 0.499 MW). The established biogas plant will produce electricity and heat from cogeneration, and it is also envisaged to use an additional OE-solar power through a photovoltaic installation which will increase the use of RES to 0,509 MWe. The project will also allow the replacement of conventional energy sources by ENERBIO and the eliminatio...

24 February 2020

18 February 2020

31 January 2020

14 January 2020