Revision history of "CONSTRUCTION OF EF PHOTOVOLTAIC POWER PLANTS WITH CONNECTION CAPACITY OF 630 KW AND 2X90 KW" (Q101842)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 94,633 bytes +19 Changed label, description and/or aliases in pt
  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 94,614 bytes +8 Set a claim value: summary (P836): Os objetivos do projeto convergem com os objetivos estratégicos da voivodia e da economia hipocarbónica, incluindo: aumento da produção de energias renováveis e redução das emissões de CO2 e de outras emissões nocivas de poeiras. A infraestrutura do projeto funcionará com a rede existente. A energia será atribuída, em parte, às necessidades próprias da instalação e à venda. O gestor da infraestrutura (o candidato) cooperará com o operador da rede (p...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

19 October 2022

27 July 2022

  • curprev 10:5610:56, 27 July 2022DG Regio talk contribs 90,372 bytes +58,461 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 18,607 bytes +3,246 Created claim: summary (P836): Objectifs du projet conformes aux objectifs stratégiques de la voïvodie et de l’économie sobre en carbone, notamment: augmentation de la production d’énergie à partir de sources renouvelables et réduction des émissions de CO2 et d’autres poussières nocives. L’infrastructure du projet coopérera avec le réseau existant. L’énergie sera utilisée en partie pour les besoins propres de l’installation et à la vente. Le gestionnaire de l’infrastructure (...
  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 15,361 bytes +160 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 15,640 bytes +150 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 15,490 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 15,637 bytes +2,846 Created claim: summary (P836): Project objectives converging with the strategic objectives of the voivodship and the low carbon economy, including: increased renewable energy production and reduction of CO2 and other harmful dust emissions. The infrastructure in the project will work with the existing network. The energy will be allocated in part to the own needs of the facility and for sale. The infrastructure manager (the applicant) will cooperate with the network operator...
  • curprev 15:5115:51, 17 October 2020DG Regio talk contribs 12,791 bytes −2,405 Removed claim: summary (P836): Project objectives aligned with the region’s strategic objectives and the low carbon economy, including: increased production of renewable energy and CO2 and other harmful dust emissions. The infrastructure in the project will work with the existing network. The energy will be used in part for its own needs and for sale. The infrastructure manager (the applicant) will cooperate with the network operator (for the part of the energy intended for...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3109:31, 6 March 2020DG Regio talk contribs 13,469 bytes +2,405 Created claim: summary (P836): Project objectives aligned with the region’s strategic objectives and the low carbon economy, including: increased production of renewable energy and CO2 and other harmful dust emissions. The infrastructure in the project will work with the existing network. The energy will be used in part for its own needs and for sale. The infrastructure manager (the applicant) will cooperate with the network operator (for the part of the energy intended for s...

24 February 2020

18 February 2020

31 January 2020

14 January 2020