Revision history of "CONSTRUCTION OF PHOTOVOLTAIC POWER PLANT IN DĄBRÓWKA II" (Q101837)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 88,376 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 88,372 bytes +10 Set a claim value: summary (P836): O INVESTIMENTO PREVISTA A CONSTRUÇÃO DE UMA POTÊNCIA FOTOVOLTÁICA COM UMA CAPACIDADE DE 0,92 MW EM DąBRÓWKA, NO DISTRITO DE ÁGUA OPERANDO COM BASE NUM SISTEMA DE CONVERSÃO DA RADIAÇÃO SOLAR EM ELETRICIDADE. NO ÂMBITO DO INVESTIMENTO, ESTÁ PREVISTA A CONSTRUÇÃO/ASSEMBLEIA: 1) PANÉIS/MÓDULOS FV, 2) Inversores/Inversores, 3) SISTEMA DE ESTRUTURA DE APOIO, 4) INFRAESTRUTURA TÉCNICA – ARMAZENAMENTO, SISTEMA DE LIGAÇÃO, SEGURANÇA DA ELETRICIDADE, 5) ESTAÇ...

7 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

19 October 2022

2 July 2022

  • curprev 11:5311:53, 2 July 2022DG Regio talk contribs 82,168 bytes +52,321 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 18,099 bytes +3,016 Created claim: summary (P836): L’INVESTISSEMENT PRÉVOIT LA CONSTRUCTION D’UNE CENTRALE PHOTOVOLTAÏQUE DE 0,92 MW À DĄBRÓWKA, DANS LE DISTRICT DE PAJCZA-SKI, SUR LA BASE D’UN SYSTÈME DE CONVERSION DE L’ÉNERGIE SOLAIRE EN ÉLECTRICITÉ. DANS LE CADRE DE L’INVESTISSEMENT, IL EST PRÉVU DE CONSTRUIRE/ASSEMBLER: 1) PANNEAUX/MODULES PHOTOVOLTAÏQUES, 2) ONDULEURS/ONDULEURS, 3) SYSTÈME DE STRUCTURE DE SUPPORT, 4) INFRASTRUCTURE TECHNIQUE — CÂBLAGE, SYSTÈME DE CONNEXION, SYSTÈME DE PROTE...
  • curprev 08:5108:51, 1 December 2021DG Regio talk contribs 15,083 bytes +121 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 15,401 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 15,285 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 15,402 bytes +2,686 Created claim: summary (P836): THE INVESTMENT ENVISAGES THE CONSTRUCTION OF A PHOTOVOLTAIC POWER PLANT WITH A CAPACITY OF 0,92 MW IN DĄBRÓWKA, IN THE SPIDER DISTRICT OPERATING ON THE BASIS OF A SYSTEM OF CONVERSION OF SOLAR RADIATION INTO ELECTRICITY. AS PART OF THE INVESTMENT, CONSTRUCTION/ASSEMBLY IS PLANNED: 1) PV PANELS/MODULES, 2) INVERTERS/INVERTERS, 3) SUPPORT STRUCTURE SYSTEM, 4) TECHNICAL INFRASTRUCTURE – WIRING, CONNECTION SYSTEM, ELECTRICITY SECURITY, 5) CONTAINER...
  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 12,716 bytes −2,075 Removed claim: summary (P836): THE INVESTMENT ENVISAGES THE CONSTRUCTION OF A 0.92 MW PHOTOVOLTAIC POWER PLANT ON THE SECONDARY LEVEL, IN THE DISTRICT OF PAJĘCZAŃSKIM, WHICH OPERATES ON THE BASIS OF A SOLAR ENERGY CONVERSION SYSTEM FOR ELECTRICITY. THE INVESTMENT IS PLANNED TO BE BUILT/ASSEMBLED: (1) SOLAR PANELS/MODULES, 2) INVERTERS/INVERTERS, 3) SYSTEM FOR THE SUPPORT STRUCTURE, 4) TECHNICAL INFRASTRUCTURE — CABLES, CONNECTION SYSTEM, POWER SECURITY, 5) A CONTAINER TRANS...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3109:31, 6 March 2020DG Regio talk contribs 13,075 bytes +2,075 Created claim: summary (P836): THE INVESTMENT ENVISAGES THE CONSTRUCTION OF A 0.92 MW PHOTOVOLTAIC POWER PLANT ON THE SECONDARY LEVEL, IN THE DISTRICT OF PAJĘCZAŃSKIM, WHICH OPERATES ON THE BASIS OF A SOLAR ENERGY CONVERSION SYSTEM FOR ELECTRICITY. THE INVESTMENT IS PLANNED TO BE BUILT/ASSEMBLED: (1) SOLAR PANELS/MODULES, 2) INVERTERS/INVERTERS, 3) SYSTEM FOR THE SUPPORT STRUCTURE, 4) TECHNICAL INFRASTRUCTURE — CABLES, CONNECTION SYSTEM, POWER SECURITY, 5) A CONTAINER TRANSFO...

24 February 2020

18 February 2020

31 January 2020

14 January 2020