Revision history of "CONSTRUCTION OF PHOTOVOLTAIC POWER PLANTS WITH CONNECTION CAPACITY OF 99 KW AND 5 KW AT THE RASKO SP MEAT PROCESSING PLANT. J. IN THE MUNICIPALITY OF ŻELECHLINEK" (Q101810)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 94,660 bytes +112 Changed label, description and/or aliases in lv, it, da, bg, sk, fr, hu, el, es, ro, ga, fi, et, cs, de, pt, sv, hr, sl, lt, nl, mt, and other parts

19 October 2022

27 July 2022

  • curprev 10:5510:55, 27 July 2022DG Regio talk contribs 93,734 bytes +60,914 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 19,021 bytes +3,313 Created claim: summary (P836): Objectifs du projet conformes aux objectifs stratégiques de la province et de l’économie sobre en carbone, notamment: augmentation de la production d’énergie à partir de sources renouvelables et réduction des émissions de CO2 et d’autres poussières nocives. L’infrastructure du projet coopérera avec le réseau existant de KSE. L’énergie sera utilisée pour les besoins propres de l’installation et en partie pour la vente. Le gestionnaire de l’infras...
  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 15,708 bytes +251 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 15,896 bytes +222 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 15,674 bytes −238 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 15,912 bytes +2,906 Created claim: summary (P836): Project objectives converging with the strategic objectives of the region and the low-carbon economy, including: increased renewable energy production and reduction of CO2 and other harmful dust emissions. The infrastructure in the project will cooperate with the existing network of KSEs. The energy will be used for the own needs of the facility and partly for sale. The manager of this infrastructure (the applicant) will cooperate with the netwo...
  • curprev 15:4315:43, 17 October 2020DG Regio talk contribs 13,006 bytes −2,537 Removed claim: summary (P836): Project objectives aligned with the region’s strategic objectives and low carbon economy, including: increased production of renewable energy and CO2 and other harmful dust emissions. The infrastructure in the project will work with the existing network of the KSE network. The energy will be used for the own purpose of the plant and, in part, for sale. The manager of that infrastructure (the applicant) will cooperate with the network operator...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3109:31, 6 March 2020DG Regio talk contribs 13,816 bytes +2,537 Created claim: summary (P836): Project objectives aligned with the region’s strategic objectives and low carbon economy, including: increased production of renewable energy and CO2 and other harmful dust emissions. The infrastructure in the project will work with the existing network of the KSE network. The energy will be used for the own purpose of the plant and, in part, for sale. The manager of that infrastructure (the applicant) will cooperate with the network operator (f...

24 February 2020

18 February 2020

31 January 2020

14 January 2020