Revision history of "CONSTRUCTION OF ROOFING PHOTOVOLTAIC MICRO-INSTALLATION WITH A CAPACITY OF 39,61 KWP FOR ELECTRICITY PRODUCTION BY SPECIALISED HEALTHCARE FACILITY “FEL-MED” SP. Z O.O. IN KONSTANTYNÓW ŁÓDZKI" (Q101796)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 90,820 bytes −3 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 90,823 bytes −210 Set a claim value: summary (P836): PROJETO EXECUTADO POR UMA INSTALAÇÃO DE SAÚDE ESPECIALIZADA FEL-MED SP. Z O.O. IN KONSTANTYNÓW ŁÓDZKIE RESPEITA À CONSTRUÇÃO DE UMA INSTALAÇÃO FV COM UMA CAPACIDADE DE 39,60 KWP E UMA POTÊNCIA DE VENTO DE 1 KWP. O principal objectivo do projecto consiste em aumentar a produção de electricidade a partir de fontes de energia renováveis. Sou de LODZ. A EXECUÇÃO DO PROJECTO ESTÁ SIGNIFICATIVAMENTE EM CONFORMIDADE COM OS OBJETIVOS ESTRATÉGICOS E OBJETIVO...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 87,498 bytes +4,055 Changed label, description and/or aliases in da, it, sk, hr, et, fi, de, ro, hu, el, sv, es, pt, lv, cs, ga, lt, nl, fr, sl, bg, mt, and other parts

19 October 2022

2 July 2022

  • curprev 11:5211:52, 2 July 2022DG Regio talk contribs 82,629 bytes +51,582 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 18,359 bytes +2,942 Created claim: summary (P836): PROJET MIS EN ŒUVRE PAR L’ÉTABLISSEMENT DE SOINS DE SANTÉ SPÉCIALISÉ FEL-MED SP. Z O.O. À KONSTANTYNÓW ŁÓDZKI CONCERNE LA CONSTRUCTION D’UNE INSTALLATION PHOTOVOLTAÏQUE D’UNE CAPACITÉ DE 39,60 KWC ET D’UNE PUISSANCE ÉOLIENNE DE 1 KWC. L’OBJECTIF PRINCIPAL DU PROJET EST D’ACCROÎTRE LA PRODUCTION D’ÉLECTRICITÉ À PARTIR DE SOURCES D’ÉNERGIE RENOUVELABLES. LE PROJET RENFORCERA LA SÉCURITÉ ÉNERGÉTIQUE DE LA GUERRE. C’EST LODZ. LA MISE EN ŒUVRE DU PRO...
  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 15,417 bytes +282 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:4215:42, 17 October 2020DG Regio talk contribs 15,574 bytes +257 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4215:42, 17 October 2020DG Regio talk contribs 15,317 bytes −259 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4215:42, 17 October 2020DG Regio talk contribs 15,576 bytes +2,546 Created claim: summary (P836): PROJECT IMPLEMENTED BY A SPECIALISED HEALTHCARE FACILITY FEL-MED SP. Z O.O. IN KONSTANTYNÓW ŁÓDZKIE CONCERNS THE CONSTRUCTION OF A PV INSTALLATION WITH A CAPACITY OF 39,60 KWP AND WIND POWER OF 1 KWP. THE MAIN OBJECTIVE OF THE PROJECT IS TO INCREASE THE PRODUCTION OF ELECTRICITY FROM RES. THE PROJECT WILL STRENGTHEN THE ENERGY SECURITY OF THE WARS. I'M FROM LODZ. THE IMPLEMENTATION OF THE PROJECT IS SIGNIFICANTLY IN LINE WITH THE STRATEGIC OBJEC...
  • curprev 15:4215:42, 17 October 2020DG Regio talk contribs 13,030 bytes −2,217 Removed claim: summary (P836): PROJECT IMPLEMENTED BY THE FEL-MED SP SPECIALIST HEALTHCARE FACILITY. MR O. IN KONSTANTYNOWIE CONCERNING THE CONSTRUCTION OF A PV CAPACITY OF 39,60 KWP AND WIND WITH A CAPACITY OF 1 KWP. THE MAIN OBJECTIVE OF THE PROJECT IS TO INCREASE THE PRODUCTION OF ELECTRICITY FROM RES. THE PROJECT WILL STRENGTHEN THE ENERGY SECURITY OF WOJ. ŁÓDZKIE. THE IMPLEMENTATION OF THE PROJECT IS A SIGNIFICANT PART OF THE STRATEGIC OBJECTIVES AND OBJECTIVES CONTAIN...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3109:31, 6 March 2020DG Regio talk contribs 13,538 bytes +2,217 Created claim: summary (P836): PROJECT IMPLEMENTED BY THE FEL-MED SP SPECIALIST HEALTHCARE FACILITY. MR O. IN KONSTANTYNOWIE CONCERNING THE CONSTRUCTION OF A PV CAPACITY OF 39,60 KWP AND WIND WITH A CAPACITY OF 1 KWP. THE MAIN OBJECTIVE OF THE PROJECT IS TO INCREASE THE PRODUCTION OF ELECTRICITY FROM RES. THE PROJECT WILL STRENGTHEN THE ENERGY SECURITY OF WOJ. ŁÓDZKIE. THE IMPLEMENTATION OF THE PROJECT IS A SIGNIFICANT PART OF THE STRATEGIC OBJECTIVES AND OBJECTIVES CONTAINED...

24 February 2020

18 February 2020

31 January 2020

14 January 2020