Revision history of "“THE CONSTRUCTION OF THE PHOTOVOLTAIC FARM SADYKIERZ”" (Q101763)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 91,506 bytes −1 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 91,507 bytes +1,846 Set a claim value: summary (P836): O projecto consistirá na construção de uma infra-estrutura técnica cuja tarefa consistirá em obter energia a partir de FER, ou seja, radiação solar. Exploração fotovoltaica com potência-alvo até 0,967 MW concebida em terras aráveis em Sadykierz, município de Rzeczyca, distrito de tomaszowski, voivodia de ŁódźOs dispositivos são painéis solares autónomos com inversores, ligação elétrica e estação de transformação. Os elementos adicionais serão a estr...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

19 October 2022

2 July 2022

  • curprev 11:5211:52, 2 July 2022DG Regio talk contribs 114,014 bytes +82,113 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:3708:37, 1 December 2021DG Regio talk contribs 19,869 bytes +3,001 Created claim: summary (P836): Le projet consistera en la construction d’infrastructures techniques, dont la tâche sera d’obtenir de l’énergie à partir des SER, c’est-à-dire le rayonnement solaire. Une ferme photovoltaïque d’une capacité maximale de 0,967 MW, conçue sur des terres arables à Sadykierz, la commune de Rzeczyca, le district de Tomaszowski, la voïvodie de Łódź, les appareils sont des panneaux solaires autonomes ainsi que des onduleurs, des connexions électriques e...
  • curprev 08:3708:37, 1 December 2021DG Regio talk contribs 16,868 bytes +115 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:4215:42, 17 October 2020DG Regio talk contribs 17,192 bytes +116 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4215:42, 17 October 2020DG Regio talk contribs 17,076 bytes −107 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4115:41, 17 October 2020DG Regio talk contribs 17,183 bytes +4,473 Created claim: summary (P836): The project will consist of the construction of technical infrastructure whose task will be to obtain energy from RES, i.e. solar radiation. Photovoltaic farm with target power up to 0.967 MW designed on arable land in Sadykierz, commune Rzeczyca, district tomaszowski, Łódź VoivodeshipThe devices are free-standing solar panels with inverters, power connection and transformer station. Additional elements will be the technical road and assembly si...
  • curprev 15:4115:41, 17 October 2020DG Regio talk contribs 12,710 bytes −2,086 Removed claim: summary (P836): The project will be based on the construction of a technical infrastructure designed to procure energy from renewable energy sources in the form of solar radiation. A photovoltaic (PV) farm with a target capacity of up to 0.967 MW, designed on arable land in m. Additional elements will be the technical path and the mounting plate, the perimeter fence and the exit from the site. the electricity will be fully integrated into the national electri...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3009:30, 6 March 2020DG Regio talk contribs 13,082 bytes +2,086 Created claim: summary (P836): The project will be based on the construction of a technical infrastructure designed to procure energy from renewable energy sources in the form of solar radiation. A photovoltaic (PV) farm with a target capacity of up to 0.967 MW, designed on arable land in m. Additional elements will be the technical path and the mounting plate, the perimeter fence and the exit from the site. the electricity will be fully integrated into the national electrici...

24 February 2020

18 February 2020

31 January 2020

14 January 2020