Revision history of "CONSTRUCTION OF INSTALLATIONS FOR THE PRODUCTION OF RENEWABLE ENERGY IN THE MUNICIPALITY OF DALIKÓW" (Q101738)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 16:3516:35, 2 March 2023DG Regio talk contribs 77,984 bytes +1,538 Changed label, description and/or aliases in lv, da, ro, fr, it, hr, el, cs, bg, sk, fi, sl, et, lt, de, hu, ga, nl, sv, pt, mt, es, and other parts

19 October 2022

2 July 2022

  • curprev 11:5111:51, 2 July 2022DG Regio talk contribs 75,632 bytes +47,888 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:3508:35, 1 December 2021DG Regio talk contribs 17,137 bytes +2,685 Created claim: summary (P836): L’OBJECTIF DU PROJET EST D’ACCROÎTRE LA PRODUCTION D’ÉNERGIE RENOUVELABLE ET DE RÉDUIRE L’UTILISATION DES SOURCES D’ÉNERGIE CONVENTIONNELLES DANS LA MUNICIPALITÉ DE DALIKÓW. L’OBJECTIF SERA ATTEINT PAR LA CONSTRUCTION D’INSTALLATIONS D’ÉNERGIE RENOUVELABLE. LE PROJET COMPREND LES TÂCHES SUIVANTES: — PRÉPARATION DU PROJET (CARTES À DES FINS D’AVIS, DÉVELOPPEMENT DU PROGRAMME D’UTILISATION FONCTIONNELLE ET ÉTUDE DE FAISABILITÉ), — PROMOTION DU PRO...
  • curprev 08:3508:35, 1 December 2021DG Regio talk contribs 14,452 bytes +157 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:4115:41, 17 October 2020DG Regio talk contribs 14,734 bytes +160 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4115:41, 17 October 2020DG Regio talk contribs 14,574 bytes −174 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4115:41, 17 October 2020DG Regio talk contribs 14,748 bytes +2,415 Created claim: summary (P836): THE AIM OF THE PROJECT IS TO INCREASE THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES AND REDUCE THE USE OF CONVENTIONAL ENERGY SOURCES IN THE MUNICIPALITY OF DALIKÓW. THE OBJECTIVE WILL BE ACHIEVED BY BUILDING INSTALLATIONS FOR THE PRODUCTION OF ENERGY FROM RENEWABLE SOURCES. THE PROJECT SHALL CONSIST OF THE FOLLOWING TASKS: — PROJECT PREPARATION (MAPS FOR OPINION, DEVELOPMENT OF A FUNCTIONAL-USE PROGRAMME AND FEASIBILITY STUDY), – PROMOTION OF...
  • curprev 15:4115:41, 17 October 2020DG Regio talk contribs 12,333 bytes −1,828 Removed claim: summary (P836): THE AIM OF THE PROJECT IS TO INCREASE THE PRODUCTION OF RENEWABLE ENERGY AND TO REDUCE THE USE OF CONVENTIONAL ENERGY SOURCES IN THE AREA OF THE MUNICIPALITY OF DALIKN. THE TARGET WILL BE MET AS A RESULT OF THE INSTALLATION OF RENEWABLE ENERGY INSTALLATIONS. THE PROJECT CONSISTS OF THE FOLLOWING TASKS: PROJECT PREPARATION (FOR OPINIONS, DEVELOPMENT OF A FUNCTIONAL AND UTILITY PROGRAMME AND FEASIBILITY STUDY), — PROJECT PROMOTION (CONSTRUCTION...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 12,453 bytes +1,828 Created claim: summary (P836): THE AIM OF THE PROJECT IS TO INCREASE THE PRODUCTION OF RENEWABLE ENERGY AND TO REDUCE THE USE OF CONVENTIONAL ENERGY SOURCES IN THE AREA OF THE MUNICIPALITY OF DALIKN. THE TARGET WILL BE MET AS A RESULT OF THE INSTALLATION OF RENEWABLE ENERGY INSTALLATIONS. THE PROJECT CONSISTS OF THE FOLLOWING TASKS: PROJECT PREPARATION (FOR OPINIONS, DEVELOPMENT OF A FUNCTIONAL AND UTILITY PROGRAMME AND FEASIBILITY STUDY), — PROJECT PROMOTION (CONSTRUCTION OF...

24 February 2020

18 February 2020

31 January 2020

14 January 2020