Revision history of "CONSTRUCTION OF A PHOTOVOLTAIC FARM PIECZYSKA WITH CONNECTION CAPACITY 0,980 MW AND 0,997 MW TOGETHER WITH THE NECESSARY TECHNICAL INFRASTRUCTURE." (Q101725)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 89,986 bytes +18 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 89,968 bytes +16 Set a claim value: summary (P836): O projeto consistirá na plantação de uma instalação fotovoltaica com uma capacidade máxima de 1 977 MWe. O investimento estará localizado em Pieczyska, no condado de Wieruszów. O projecto abrangerá as parcelas n.os 744/4, 745/4, 748, 749/1; a borda do ewid. 0010 Pedaços. Área total de investimento. 1,2 ha. A instalação será totalmente automatizada e ligada a um sistema de monitorização que analisa a eficiência e o rendimento energético. Para a sua c...

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 87,919 bytes +1,265 Changed label, description and/or aliases in da, it, sk, et, bg, lv, lt, es, fr, hr, ga, de, pt, sv, ro, fi, cs, el, sl, nl, mt, hu, and other parts

19 October 2022

27 July 2022

  • curprev 10:5510:55, 27 July 2022DG Regio talk contribs 85,839 bytes +55,426 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 18,358 bytes +3,003 Created claim: summary (P836): Le projet consistera à planter une installation photovoltaïque d’une capacité maximale de 1 977 MWe. L’investissement sera situé à Pieczyska, dans le comté de Wieruszów. Le projet couvrira les parcelles 744/4, 745/4, 748 et 749/1; C’est une preuve. 0010 Pièce.. Superficie totale destinée à l’investissement. 1,2 ha. L’installation sera entièrement automatisée et connectée au système de surveillance, en analysant l’efficacité et le rendement énerg...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 15,355 bytes +226 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:1415:14, 17 October 2020DG Regio talk contribs 15,568 bytes +206 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1415:14, 17 October 2020DG Regio talk contribs 15,362 bytes −212 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1415:14, 17 October 2020DG Regio talk contribs 15,574 bytes +2,693 Created claim: summary (P836): The project will consist of planting a photovoltaic installation with a maximum capacity of 1, 977 MWe. The investment will be located in Pieczyska, in Wieruszów County. The project will cover plots No 744/4, 745/4, 748, 749/1; the edge of the ewid. 0010 Pies. Total area for investment. 1.2 ha. The installation will be fully automated and connected to a monitoring system analysing efficiency and energy yield. For its construction, PV modules wil...
  • curprev 15:1415:14, 17 October 2020DG Regio talk contribs 12,881 bytes −2,290 Removed claim: summary (P836): The project will consist of the installation of photovoltaic installations with a maximum capacity of 1, 977 MWe. The investment will be located in the town of Pieczyska, in the district of Vienna. The project will cover parcels 744/4, 745/4, 748, 749/1; hemide. 0010 Piecko. Total area covered. 1.2 ha. The installation will be fully automated and connected to a monitoring system analysing productivity and energy consumption. The PV modules wil...

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 13,454 bytes +2,290 Created claim: summary (P836): The project will consist of the installation of photovoltaic installations with a maximum capacity of 1, 977 MWe. The investment will be located in the town of Pieczyska, in the district of Vienna. The project will cover parcels 744/4, 745/4, 748, 749/1; hemide. 0010 Piecko. Total area covered. 1.2 ha. The installation will be fully automated and connected to a monitoring system analysing productivity and energy consumption. The PV modules will...

24 February 2020

18 February 2020

31 January 2020

14 January 2020