Revision history of "CONSTRUCTION OF INTEGRATED MULTIMODAL JUNCTIONS TOGETHER WITH THE CONSTRUCTION AND RECONSTRUCTION OF RAILWAY STOPS IN THE ŁÓDŹ VOIVODESHIP – WITH A MIJAKA IN THE AREA OF THE MARYSIN BOAT STOP" (Q101718)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 95,166 bytes −2 Changed label, description and/or aliases in pt
  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 95,168 bytes +7 Set a claim value: summary (P836): O objetivo do projeto «Construção de entroncamentos multimodais integrados com a construção e reconstrução de paragens ferroviárias na voivodia de Lodz – com um mijaka na paragem de Marysin em Lodz» é aumentar a disponibilidade do transporte ferroviário em Lodz, adaptar a localização das instalações de serviço de passageiros às necessidades dos residentes, aumentar a competitividade e a utilização do transporte ferroviário em relação à estrada, atra...

7 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 91,626 bytes −65 Changed label, description and/or aliases in da, it, lv, fi, sk, bg, cs, fr, pt, hr, hu, ro, mt, lt, sv, el, ga, sl, nl, et, es, de, and other parts

19 October 2022

27 September 2022

2 July 2022

  • curprev 11:5011:50, 2 July 2022DG Regio talk contribs 90,881 bytes +59,128 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 18,840 bytes +3,119 Created claim: summary (P836): L’objectif du projet «Construction de pôles multimodaux intégrés avec la construction et la reconstruction d’arrêts ferroviaires dans la voïvodie de Łódź — avec une Mianka dans la région de Łódź Marysin» est d’accroître la disponibilité du transport ferroviaire à Łódź, d’adapter la distribution des services de transport de voyageurs aux besoins des résidents, d’accroître la compétitivité et l’utilisation du transport ferroviaire par rapport à la...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 15,721 bytes +246 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 15,914 bytes +256 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 15,658 bytes −210 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 15,868 bytes +2,868 Created claim: summary (P836): The aim of the project “Construction of integrated multimodal junctions with the construction and reconstruction of railway stops in the Łódź Voivodeship – with a mijaka in the Łódź Marysin stop” is to increase the availability of rail transport in Łódź, match the location of passenger service facilities to the needs of residents, increase competitiveness and use of rail transport in relation to road, through the extension/construction of 6 mult...
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 13,000 bytes −2,351 Removed claim: summary (P836): The project ‘Construction of integrated multimodal nodes with the construction and conversion of railway stops in Łódź and with passing stops in the Łódź Navy area’ is to increase the availability of rail traffic in Łódź, to match the location of the passenger facilities to the needs of the inhabitants, increase the competitiveness and use of rail transport towards road, by extending/building 6 multimodal nodes on railway lines No 16. Widzew-K...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 13,629 bytes +2,351 Created claim: summary (P836): The project ‘Construction of integrated multimodal nodes with the construction and conversion of railway stops in Łódź and with passing stops in the Łódź Navy area’ is to increase the availability of rail traffic in Łódź, to match the location of the passenger facilities to the needs of the inhabitants, increase the competitiveness and use of rail transport towards road, by extending/building 6 multimodal nodes on railway lines No 16. Widzew-Kut...

24 February 2020

18 February 2020

31 January 2020

14 January 2020