Revision history of "CONSTRUCTION OF UL. NEW CARBON IN A BOAT ON ODC. FROM THE HIVE. WIERZBOWA TO UL. KOCCIŃSKIEGO ALONG WITH THE EXTENSION OF THE INTERSECTION WITH UL. KOPCINSKI" (Q101716)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 83,338 bytes +8 Changed label, description and/or aliases in pt
  • curprev 18:0018:00, 9 October 2024DG Regio talk contribs 83,330 bytes −272 Set a claim value: summary (P836): O INVESTIMENTO INCLUI M.IN.: CONSTRUÇÃO DO PAVIMENTO UL. NOVO CARBONO EM F.C. DE UL.WIERZBOWEJ A UL.KOPCIŃSKI, EXTENSÃO DA INTERSEÇÃO DE UL. NOWOWĘGLOWA FROM UL.KOPCIŃSKI (2 CRUZADAS DE NÍVEL), INCLUINDO: CONSTRUÇÃO DA LIGAÇÃO NORTE, CONSTRUÇÃO DE UM CONECTOR, REFORÇO DA UL. PUBLICAÇÃO, QUE É UMA LIGAÇÃO DA INTERSECÇÃO SUL, O REFURBISHMENT OF UL.TUWIMA, INCLUINDO A ALTERAÇÃO DO SEU CURSO NA VICINIDADE DO BUS LOOP, RECONSTRUÇÃO DO BUS LOOP. Como part...

20 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 80,068 bytes +5,059 Changed label, description and/or aliases in it, da, sk, bg, lv, el, fr, ro, et, sl, ga, pt, fi, cs, sv, de, es, hu, hr, lt, nl, mt, and other parts

19 October 2022

27 July 2022

  • curprev 10:5510:55, 27 July 2022DG Regio talk contribs 74,199 bytes +47,490 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 17,228 bytes +2,254 Created claim: summary (P836): L’INVESTISSEMENT COMPREND M.IN.: CONSTRUCTION DE TROTTOIRS DE RUE NOVO-CARBIDE POUR LA QUID. DE UL.WIERZBOVA À UL.KOPCI’SKI, EXTENSION DE L’INTERSECTION DE UL. NOVOCARBON DE UL.KOPCI’SKI (CONNEXION DE DEUXIÈME NIVEAU), OBEJMUJĄCA:BUDOWĘ CONNEXION, CONSTRUCTION D’UN CONNECTEUR, RECONSTRUCTION D’UL. PUBLICATION, QUI EST L’INTERSECTION SUD, RECONSTRUCTION DE L’UL.TUWIMA, Y COMPRIS UN CHANGEMENT DE CAP DANS LE VOISINAGE DE LA BOUCLE D’AUTOBUS, RECON...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 14,974 bytes +222 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 15,191 bytes +218 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 14,973 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 15,155 bytes +2,387 Created claim: summary (P836): THE INVESTMENT INCLUDES M.IN.: CONSTRUCTION OF THE PAVEMENT UL. IT’S NEW CARBON ON F.C. FROM UL.WIERZBOWEJ TO UL.KOPCIŃSKI, EXTENSION OF THE INTERSECTION OF UL. NOWOWĘGLOWA FROM UL.KOPCIŃSKI (2 LEVEL CROSSROADS), INCLUDING: CONSTRUCTION OF THE NORTHERN LINK, CONSTRUCTION OF A CONNECTOR, REFURBISHMENT OF UL. PUBLISHING, WHICH IS A LINKAGE OF THE SOUTHERN INTERSECTION, THE REFURBISHMENT OF UL.TUWIMA, INCLUDING CHANGING ITS COURSE IN THE VICINITY O...
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 12,768 bytes −2,102 Removed claim: summary (P836): THE INVESTMENT SHALL INCLUDE THE FOLLOWING: PAVEMENT CONSTRUCTION UL. TO THE NOWEAR. FROM UL.ANIMAL TO UL.KOPCIŃSKI, EXTENSION OF UL. UL. A NOWEAR, WITH UL.KOPCIŃSKI (2 LEVEL INTERSECTION), INCLUDING THE CONSTRUCTION OF A NORTH LINK, THE CONSTRUCTION OF A LINK, THE RECONSTRUCTION OF UL. PUBLISHING, CONSISTING OF SOUTH PAIR CROSSINGS, RECONSTRUCTION OF THE UL.TUWIMA, INCLUDING A CHANGE IN ITS EVOLUTION IN THE VICINITY OF THE BUS NETWORK, UPGRAD...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 13,144 bytes +2,102 Created claim: summary (P836): THE INVESTMENT SHALL INCLUDE THE FOLLOWING: PAVEMENT CONSTRUCTION UL. TO THE NOWEAR. FROM UL.ANIMAL TO UL.KOPCIŃSKI, EXTENSION OF UL. UL. A NOWEAR, WITH UL.KOPCIŃSKI (2 LEVEL INTERSECTION), INCLUDING THE CONSTRUCTION OF A NORTH LINK, THE CONSTRUCTION OF A LINK, THE RECONSTRUCTION OF UL. PUBLISHING, CONSISTING OF SOUTH PAIR CROSSINGS, RECONSTRUCTION OF THE UL.TUWIMA, INCLUDING A CHANGE IN ITS EVOLUTION IN THE VICINITY OF THE BUS NETWORK, UPGRADIN...

24 February 2020

18 February 2020

31 January 2020

14 January 2020