Revision history of "RECONSTRUCTION OF DISTRICT ROAD NO. 2158E OF THE SOKÓŁ-KRZYZAN RELATIONSHIP TO THE JUNCTION OF THE A1 MOTORWAY “KUTNO-EAST”" (Q101714)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 81,380 bytes −15 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 81,395 bytes +71 Set a claim value: summary (P836): O objectivo do projecto consiste em melhorar o estatuto e a ligação da rede de estradas tectónicas GM com a rede de estradas nacionais, a rede de transportes transeuropeus e a melhoria da segurança rodoviária na Comunidade. O projecto abrangerá o impacto de todos os residentes da Comunidade. A ESTRADA REDEVOLVIDA SERÁ UTILIZADA POR OUTROS UTILIZADORES QUE PASSAM POR ESTRADAS LOCAIS. A estrada SDR é de 1070 km/dia. O PROJETO encontra-se localizado em...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 77,790 bytes −545 Changed label, description and/or aliases in lv, it, da, bg, sk, ro, et, de, pt, lt, cs, ga, sv, hr, hu, sl, es, mt, fr, nl, fi, el, and other parts

19 October 2022

2 July 2022

  • curprev 11:5011:50, 2 July 2022DG Regio talk contribs 77,527 bytes +49,440 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 17,252 bytes +2,612 Created claim: summary (P836): L’OBJECTIF DU PROJET EST D’AMÉLIORER L’ÉTAT ET L’INTERCONNEXION DU RÉSEAU ROUTIER DE GM. KRZY’ANÓW AVEC LE RÉSEAU ROUTIER NATIONAL, LE RÉSEAU TRANSEUROPÉEN DE TRANSPORT DIX-T, ET D’AMÉLIORER LA SÉCURITÉ ROUTIÈRE DANS LA MUNICIPALITÉ. LE PROJET PORTERA SUR L’IMPACT DE TOUS LES RÉSIDENTS DE LA MUNICIPALITÉ. LES AUTRES USAGERS QUI TRAVERSENT LES ROUTES LOCALES POURRONT UTILISER LA ROUTE RECONSTRUITE. LE DTS DE LA ROUTE EST DE 1070 VOL/JOUR. LE PROJ...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 14,640 bytes +200 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 14,879 bytes +189 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 14,690 bytes −189 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 14,879 bytes +2,420 Created claim: summary (P836): THE AIM OF THE PROJECT IS TO IMPROVE THE STATUS AND LINK OF THE NETWORK OF GM. TEUTONIC ROADS WITH THE NETWORK OF NATIONAL ROADS, THE TRANS-EUROPEAN TRANSPORT NETWORK, AND THE IMPROVEMENT OF ROAD SAFETY IN THE COMMUNE. THE PROJECT WILL COVER THE IMPACT OF ALL RESIDENTS OF THE MUNICIPALITY. THE REDEVELOPED ROAD WILL BE USED BY OTHER USERS PASSING BY LOCAL ROADS. SDR ROAD IS 1070 KM/DAY. THE PROJECT IS LOCATED IN GM. KRZYŻANÓW, KUTNOWSKI COUNTY, Ł...
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 12,459 bytes −1,880 Removed claim: summary (P836): THE AIM OF THE PROJECT IS TO IMPROVE THE STATUS AND LINK THE GM ROAD NETWORK WITH THE NETWORK OF NATIONAL ROADS, THE TEN-T TEN-T TRANSPORT NETWORK AND THE IMPROVEMENT OF ROAD SAFETY IN THE MUNICIPALITY. THE PROJECT WILL INVOLVE ALL THE INHABITANTS OF THE MUNICIPALITY. OTHER USERS CROSSING LOCAL ROADS WILL BE ABLE TO BENEFIT FROM THE RECONSTRUCTED ROAD. SDR IS 1070 P/DAY. THE PROJECT IS LOCATED IN THE GM. THE PROJECT INVOLVES THE RECONSTRUCTION...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 12,624 bytes +1,880 Created claim: summary (P836): THE AIM OF THE PROJECT IS TO IMPROVE THE STATUS AND LINK THE GM ROAD NETWORK WITH THE NETWORK OF NATIONAL ROADS, THE TEN-T TEN-T TRANSPORT NETWORK AND THE IMPROVEMENT OF ROAD SAFETY IN THE MUNICIPALITY. THE PROJECT WILL INVOLVE ALL THE INHABITANTS OF THE MUNICIPALITY. OTHER USERS CROSSING LOCAL ROADS WILL BE ABLE TO BENEFIT FROM THE RECONSTRUCTED ROAD. SDR IS 1070 P/DAY. THE PROJECT IS LOCATED IN THE GM. THE PROJECT INVOLVES THE RECONSTRUCTION O...

24 February 2020

18 February 2020

31 January 2020

14 January 2020