Revision history of "Model of reliability of the electricity system using the Monte Carlo method" (Q10058)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 October 2024

  • curprev 03:2803:28, 10 October 2024DG Regio talk contribs 51,928 bytes −3 Changed label, description and/or aliases in pt
  • curprev 03:2803:28, 10 October 2024DG Regio talk contribs 51,931 bytes +17 Set a claim value: summary (P836): O objetivo do projeto é criar softwares que avaliem a confiabilidade do balanço energético do sistema elétrico (ES). O software basear-se-á na aplicação do método de Monte Carlo. A solução irá desenvolver um aparelho matemático optimizado para calcular a fiabilidade da cobertura de carga para cada hora do ano. O software criado será utilizado para resolver as encomendas do requerente no âmbito do seu atual modelo de aparelho e será disponibilizado e...

22 March 2024

15 January 2024

19 June 2023

11 June 2023

17 February 2023

2 July 2022

  • curprev 11:2611:26, 2 July 2022DG Regio talk contribs 49,244 bytes +28,522 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 07:4607:46, 2 December 2021DG Regio talk contribs 16,041 bytes +1,388 Created claim: summary (P836): Ziel des Projekts ist es, eine Software zu entwickeln, die die Zuverlässigkeit der Leistungsbilanz des Stromsystems (ES) bewertet. Die Software basiert auf der Anwendung der Monte Carlo Methode. Im Rahmen der Lösung wird ein mathematisches Gerät entwickelt, um die Zuverlässigkeit der Lastdeckung für jede Stunde des Jahres zu berechnen. Die erstellte Software wird zur Bearbeitung der Aufträge des Antragstellers im Rahmen seines derzeitigen Modell...
  • curprev 07:4607:46, 2 December 2021DG Regio talk contribs 14,653 bytes +132 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 08:5908:59, 28 November 2021DG Regio talk contribs 14,521 bytes +1,406 Created claim: summary (P836): L’objectif du projet est de créer un logiciel qui évaluera la fiabilité du bilan de performance du système électrique (ES). Le logiciel sera basé sur l’application de la méthode Monte Carlo. Dans le cadre de la solution, un appareil mathématique sera développé optimisé pour calculer la fiabilité de la couverture de charge pour chaque heure de l’année. Le logiciel créé sera utilisé pour traiter les commandes du demandeur dans le cadre de son modè...
  • curprev 08:5908:59, 28 November 2021DG Regio talk contribs 13,115 bytes +138 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 14:5314:53, 22 October 2020DG Regio talk contribs 13,426 bytes +1,353 Created claim: summary (P836): The aim of the project is to create software that will evaluate the reliability of the power balance of the electricity system (ES). The software will be based on application of the Monte Carlo method. The solution will develop a mathematical apparatus optimised to calculate the reliability of the load coverage for each hour of the year. The software created will be used to solve the applicant’s orders as part of his current model apparatus and...
  • curprev 14:5314:53, 22 October 2020DG Regio talk contribs 12,073 bytes −877 Removed claim: summary (P836): The project aims at creating a software that will evaluate the reliability of the power supply system (ES). The software will be based on the Monte Carlo method. The solution will develop a mathematical apparatus optimised for the calculation of the reliability of the load coverage for each hour of the year. The software created will be used to address the applicant’s contracts as part of its current model apparatus and will be made available...
  • curprev 06:2606:26, 22 October 2020DG Regio talk contribs 12,950 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:2606:26, 22 October 2020DG Regio talk contribs 12,816 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 16:2816:28, 25 February 2020DG Regio talk contribs 11,666 bytes +877 Created claim: summary (P836): The project aims at creating a software that will evaluate the reliability of the power supply system (ES). The software will be based on the Monte Carlo method. The solution will develop a mathematical apparatus optimised for the calculation of the reliability of the load coverage for each hour of the year. The software created will be used to address the applicant’s contracts as part of its current model apparatus and will be made available un...

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020