Revision history of "Reconstruction and extension of Voivodeship No. 134 of Ośno Lubuskie – Rzepin" (Q100448)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 94,576 bytes −14 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 94,590 bytes −55 Set a claim value: summary (P836): O projeto inclui a reconstrução do pavimento rodoviário DW 134 sob a forma de reforço com um pacote de novas camadas betuminosas. Haverá também reconstrução dos cruzamentos existentes e das encruzilhadas existentes com estradas comunais e distritais na medida necessária para a reconstrução do DW (apenas até à fronteira da faixa de rodagem). O escopo também inclui a construção de uma baía para pesagem de veículos. São 10,20 milhas. O objetivo global...

12 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 17:0117:01, 2 March 2023DG Regio talk contribs 91,526 bytes +1,066 Changed label, description and/or aliases in sv, lv, sk, da, it, ga, lt, fi, fr, et, ro, cs, pt, sl, el, de, es, nl, hr, hu, bg, mt, and other parts

21 October 2022

2 July 2022

  • curprev 11:2311:23, 2 July 2022DG Regio talk contribs 89,649 bytes +57,176 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

3 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 19,727 bytes +3,330 Created claim: summary (P836): Le projet porte sur la reconstruction de la surface de la route DW 134 sous la forme d’un ensemble de nouvelles couches bitumineuses. Il y aura également des sorties reconstruites et des jonctions existantes avec des routes communales et de district dans la mesure nécessaire à la reconstruction de DW (uniquement jusqu’à la frontière de la voie routière). La construction d’une baie pour les véhicules de pesage est également incluse.La route sera...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 16,397 bytes +135 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 16,701 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 16,562 bytes −134 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 16,696 bytes +2,985 Created claim: summary (P836): The project includes the reconstruction of the road pavement DW 134 in the form of strengthening it with a package of new bituminous layers. There will also be reconstruction of the existing junctions and the existing crossroads with communal and district roads to the extent necessary for the reconstruction of the DW (only to the border of the road lane). The scope also includes the construction of a bay for weighing vehicles.The road will be re...
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 13,711 bytes −2,487 Removed claim: summary (P836): The project covers the reconstruction of road surface 134 in the form of a strengthening of the package of new bitumen layers. There will also be ongoing conversions and existing intersections, with the municipal and district roads to the extent necessary for the conversion of the DW (to the border of the road lane only. It also includes the construction of a bay for the weighing of vehicles. the road will be rebuilt to the rest. 10.20 km. The...

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0410:04, 6 March 2020DG Regio talk contribs 14,060 bytes +2,487 Created claim: summary (P836): The project covers the reconstruction of road surface 134 in the form of a strengthening of the package of new bitumen layers. There will also be ongoing conversions and existing intersections, with the municipal and district roads to the extent necessary for the conversion of the DW (to the border of the road lane only. It also includes the construction of a bay for the weighing of vehicles. the road will be rebuilt to the rest. 10.20 km. The o...

24 February 2020

18 February 2020

31 January 2020

14 January 2020