Revision history of "Extension of Voivodeship Road No. 295 in Gorzupia Dolna" (Q100446)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 17:5717:57, 9 October 2024DG Regio talk contribs 87,848 bytes 0 Changed label, description and/or aliases in pt
  • curprev 17:5717:57, 9 October 2024DG Regio talk contribs 87,848 bytes −314 Set a claim value: summary (P836): O projeto tem por objeto a extensão da estrada do Voivodato n.o 295 em Gorzupia Dolna do km 7 + 766 para o km 8 + 441 com uma extensão de 0,67 km, incluindo a extensão da estrada para 6,5 m, a construção de ilhas que abrandam o tráfego, a reconstrução de cruzamentos e saídas, a reconstrução do circuito de autocarros, a construção de pavimentos, a melhoria da drenagem – construção da drenagem das águas pluviais, construção de iluminação, nova marcaçã...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

27 July 2022

  • curprev 10:4410:44, 27 July 2022DG Regio talk contribs 78,314 bytes +48,348 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 17,814 bytes +3,030 Created claim: summary (P836): Le projet concerne l’extension de la route provinciale no 295 à Gorzupia Dolna du km 7 + 766 au km 8 + 441 d’une longueur de 0,67 km, y compris l’extension de la route à 6,5 m, la construction d’îles ralentissant la circulation, la reconstruction des intersections et des sorties, la reconstruction de la boucle d’autobus, la construction de trottoirs, l’amélioration du drainage — construction de drainages pluviaux, la construction d’éclairage, la...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 14,784 bytes +117 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 15,106 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 14,992 bytes −117 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 15,109 bytes +2,461 Created claim: summary (P836): The subject of the project is the extension of the Voivodeship Road No. 295 in Gorzupia Dolna from km 7 + 766 to km 8+ 441 with a length of 0.67 km, including extension of the road to 6.5 m, construction of islands slowing down traffic, reconstruction of junctions and exits, reconstruction of the bus loop, construction of pavements, improvement of drainage – construction of rainwater drainage, construction of lighting, new vertical and horizonta...
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 12,648 bytes −2,156 Removed claim: summary (P836): The project consists of the extension of provincial road No 295 in the town of Gorzupia Dolna from km 7 + 766 to km 8 + 441, with a length of 0.67 km, including extending the road to 6.5 m, building islands that slow down traffic, upgrading crossings and exits, upgrading of bus loops, constructing pavements, improving drainage — construction of storm water drainage, construction of a new vertical and horizontal marking. The main objective of t...

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0410:04, 6 March 2020DG Regio talk contribs 13,079 bytes +2,156 Created claim: summary (P836): The project consists of the extension of provincial road No 295 in the town of Gorzupia Dolna from km 7 + 766 to km 8 + 441, with a length of 0.67 km, including extending the road to 6.5 m, building islands that slow down traffic, upgrading crossings and exits, upgrading of bus loops, constructing pavements, improving drainage — construction of storm water drainage, construction of a new vertical and horizontal marking. The main objective of the...

24 February 2020

18 February 2020

31 January 2020

14 January 2020