Revision history of "Integrated Cycling Track System in the municipalities of Babimost, Kargowa and Zbąszynek" (Q100356)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

21 October 2022

2 July 2022

  • curprev 11:2111:21, 2 July 2022DG Regio talk contribs 86,755 bytes +54,912 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

3 December 2021

1 December 2021

  • curprev 08:4208:42, 1 December 2021DG Regio talk contribs 20,261 bytes +3,145 Created claim: summary (P836): Le projet concerne la construction d’un réseau de pistes cyclables, qui servira de corridors de transport en remplacement d’autres modes de transport. Le projet est un investissement routier qui consiste à construire des pistes cyclables. En particulier, l’investissement prévoit des travaux de construction dans les secteurs suivants: route, pont, assainissement — drainage des routes, électricité — éclairage des routes, construction et constructi...
  • curprev 08:4208:42, 1 December 2021DG Regio talk contribs 17,116 bytes +156 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:4100:41, 16 October 2020DG Regio talk contribs 17,399 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:4100:41, 16 October 2020DG Regio talk contribs 17,251 bytes −141 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:4100:41, 16 October 2020DG Regio talk contribs 17,392 bytes +2,837 Created claim: summary (P836): The subject of the project is the construction of a network of bicycle paths, which will serve as transport corridors, which are an alternative to other modes of transport. The project is a road investment involving the construction of bicycle paths. In particular, the investment envisages construction works in the following sectors: road, bridge, sanitary – drainage of roads, electricity – illumination of roads, construction and construction –...
  • curprev 00:4100:41, 16 October 2020DG Regio talk contribs 14,555 bytes −2,272 Removed claim: summary (P836): The project aims at building a network of cycle paths which will serve as an alternative to other modes of transport. The project is a road investment in the construction of cycle paths. The investment foresees in particular construction work in the sectors of: road, bridge, sanitation — road drainage, road lighting, construction and construction — a small architecture. In addition, in all necessary cases, industry work will be carried out in...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0110:01, 6 March 2020DG Regio talk contribs 14,283 bytes +2,272 Created claim: summary (P836): The project aims at building a network of cycle paths which will serve as an alternative to other modes of transport. The project is a road investment in the construction of cycle paths. The investment foresees in particular construction work in the sectors of: road, bridge, sanitation — road drainage, road lighting, construction and construction — a small architecture. In addition, in all necessary cases, industry work will be carried out in co...

24 February 2020

18 February 2020

31 January 2020

14 January 2020