Revision history of "Implementation of innovative products by investing in a hall, equipment and software in IBM-Pack in Nowa Sól" (Q100206)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:4603:46, 11 October 2024DG Regio talk contribs 88,031 bytes +1 Changed label, description and/or aliases in pt
  • curprev 03:4603:46, 11 October 2024DG Regio talk contribs 88,030 bytes +107 Set a claim value: summary (P836): O projeto aumentará a competitividade da empresa.O âmbito do material é expresso nas fases 1-6 do projeto: É a fase 1. Aquisição de serviços de trabalhos preparatórios para otimizar a conceção do investimento, Fase 2. Aquisição de obras de construção e de materiais para a construção de um novo pavilhão (1221,3 m2) que otimiza a produção e permite a implementação de novos produtos; É a fase 3. Aquisição de serviços de supervisão técnica do edifício p...

12 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0319:03, 2 March 2023DG Regio talk contribs 84,389 bytes −2,347 Changed label, description and/or aliases in it, fr, lv, da, ro, es, el, sk, fi, sv, et, cs, hu, pt, sl, ga, lt, hr, de, mt, bg, nl, and other parts

21 October 2022

2 July 2022

  • curprev 11:1811:18, 2 July 2022DG Regio talk contribs 85,924 bytes +55,367 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 18,182 bytes +3,083 Created claim: summary (P836): Proj. augmentera la compétitivité de l’entreprise.Le champ d’application matériel est exprimé en étapes 1-6 du projet: Étape 1. L’achat de services pour l’exécution des travaux préparatoires sert la conception optimale de l’investissement, étape 2. Achat de travaux de construction et de matériaux pour la construction d’un nouveau hall (1 221,3 m²) qui optimise la production et permet la mise en œuvre de nouveaux produits; Étape 3. Achat de servi...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 15,099 bytes +199 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 15,339 bytes +169 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 15,170 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 15,338 bytes +2,779 Created claim: summary (P836): The project will increase the competitiveness of the company.The scope of the material is expressed in stages 1-6 of the project: It’s stage 1. Purchase of preparatory work services for optimal design of the investment, Stage 2. Purchase of construction works and materials for the construction of a new hall (1221.3 m²) which optimises production and allows the implementation of new products; It’s stage 3. Purchase of technical supervision servic...
  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 12,559 bytes −2,237 Removed claim: summary (P836): Pro.This will increase the competitiveness of the company. the factual scope stands for the steps 1-6 proj: Step 1. The purchase of services for the execution of preparatory works. optimal design of the investment, step 2. The purchase of construction works and materials for the construction of a new arena (1 221.3 m²) optimising production and allowing the implementation of new products; Step 3. The purchase of technical supervision services...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3609:36, 6 March 2020DG Regio talk contribs 13,081 bytes +2,237 Created claim: summary (P836): Pro.This will increase the competitiveness of the company. the factual scope stands for the steps 1-6 proj: Step 1. The purchase of services for the execution of preparatory works. optimal design of the investment, step 2. The purchase of construction works and materials for the construction of a new arena (1 221.3 m²) optimising production and allowing the implementation of new products; Step 3. The purchase of technical supervision services fo...

24 February 2020

18 February 2020

31 January 2020

14 January 2020