Revision history of "Implementation of process, product and organizational innovation in ZPU Joniec Sp. z o.o." (Q100202)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 85,812 bytes +3 Changed label, description and/or aliases in pt
  • curprev 03:4703:47, 11 October 2024DG Regio talk contribs 85,809 bytes +24 Set a claim value: summary (P836): O objecto do projecto planeado pela ZPU Joniec Sp. z o.o. é a implementação de um processo de produção inovador no departamento de produção recém-criado. O projeto consiste na implementação de tecnologia inovadora à escala transregional da produção de grandes diâmetros pré-isolados, cuja implementação será assegurada pela aquisição de ativos fixos e pela adaptação das instalações do pavilhão, onde será implementada uma produção substancialmente melh...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

21 October 2022

27 July 2022

  • curprev 10:4110:41, 27 July 2022DG Regio talk contribs 81,430 bytes +52,269 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 17,672 bytes +2,778 Created claim: summary (P836): Le projet prévu par ZPU Jońca Sp. z o.o. est de mettre en œuvre un processus de production innovant dans le département de production nouvellement créé. Le projet implique la mise en œuvre d’une technologie transrégionale innovante pour la production de grands diamètres pré-isolés, dont la mise en œuvre sera assurée par l’achat d’immobilisations et l’adaptation des locaux du hall, où la production sera essentiellement améliorée sur la base de so...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 14,894 bytes +164 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 15,169 bytes +148 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 15,021 bytes −149 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 15,170 bytes +2,651 Created claim: summary (P836): The subject of the project planned by ZPU Joniec Sp. z o.o. is the implementation of an innovative production process at the newly created production department. The project consists of the implementation of innovative technology on a trans-regional scale of the production of pre-insulated large diameters, the implementation of which will be ensured by the purchase of fixed assets and the adaptation of the hall premises, where substantially impr...
  • curprev 00:1600:16, 16 October 2020DG Regio talk contribs 12,519 bytes −2,157 Removed claim: summary (P836): The project is intended to implement an innovative manufacturing process in a newly created production unit. The project consists of the implementation of innovative, regionally innovative production of pre-insulated large diameter shapes, the implementation of which will ensure the purchase of fixed assets and the adaptation of the halls where the overall improved production will be carried out on the basis of highly innovative technological...

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:3609:36, 6 March 2020DG Regio talk contribs 12,950 bytes +2,157 Created claim: summary (P836): The project is intended to implement an innovative manufacturing process in a newly created production unit. The project consists of the implementation of innovative, regionally innovative production of pre-insulated large diameter shapes, the implementation of which will ensure the purchase of fixed assets and the adaptation of the halls where the overall improved production will be carried out on the basis of highly innovative technological so...

24 February 2020

18 February 2020

31 January 2020

14 January 2020