Revision history of "Ensuring access to broadband internet in fibre technology in northern Greater Poland" (Q86889)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)

29 October 2020

14 October 2020

  • curprev 15:2715:27, 14 October 2020DG Regio talk contribs 45,079 bytes +143 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:2715:27, 14 October 2020DG Regio talk contribs 44,936 bytes −139 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:2715:27, 14 October 2020DG Regio talk contribs 45,075 bytes +2,335 Created claim: summary (P836): The project will consist of building a fibre network and providing access to broadband Internet with guaranteed capacity of at least 30 Mbps in areas excluded digitally in the Intervention Area – PILSKI.The project will be made in ground technology – the cables will be arranged in telecommunication sewerage. The implementation period of the project is planned for 36 months. As part of the project, infrastructure will be built in the form of fibr...
  • curprev 15:2715:27, 14 October 2020DG Regio talk contribs 42,740 bytes −1,581 Removed claim: summary (P836): The project will consist of the construction of a fibre optic network and the provision of broadband internet with guaranteed speeds of at least 30 Mbps in the areas that are digitally excluded in the intervening area — PILSKIM.The project will be carried out in terrestrial technology. the project will be arranged in teletechnical sewerage.The duration of the project is foreseen for 36 months.As part of the project, a fibre network infrastruct...

23 September 2020

16 July 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1210:12, 4 March 2020DG Regio talk contribs 28,535 bytes +1,581 Created claim: summary (P836): The project will consist of the construction of a fibre optic network and the provision of broadband internet with guaranteed speeds of at least 30 Mbps in the areas that are digitally excluded in the intervening area — PILSKIM.The project will be carried out in terrestrial technology. the project will be arranged in teletechnical sewerage.The duration of the project is foreseen for 36 months.As part of the project, a fibre network infrastructur...

18 February 2020

(newest | oldest) View ( | ) (20 | 50 | 100 | 250 | 500)