Revision history of "The Two-Creature Gas pipeline" (Q86134)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

26 January 2023

25 January 2023

24 October 2022

26 July 2022

  • curprev 04:2704:27, 26 July 2022DG Regio talk contribs 46,676 bytes +26,164 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2721:27, 30 November 2021DG Regio talk contribs 16,840 bytes +1,396 Created claim: summary (P836): Le projet concerne la construction du gazoduc DN1000 MOP 8,4MPa d’une longueur de 55 km de la jonction Tworóg prévue (mise en œuvre dans le cadre du projet Kędzierzyn — Tworóg: Voïvodie de Silésie, district de Tarno Góra) jusqu’à l’équipe du barrage et de l’évent de Tworzeń (Voïvodie de Silésie, ville de Dąbrowa Górnicza), y compris les infrastructures: 5 unités d’arrêt le long de la route du pipeline, dispositifs de protection contre la cathode...
  • curprev 21:2721:27, 30 November 2021DG Regio talk contribs 15,444 bytes +83 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,801 bytes +88 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,713 bytes −84 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 15,797 bytes +1,326 Created claim: summary (P836): The subject of the project is the construction of the DN1000 ILO 8.4MPa gas pipeline with a length of 55 km from the Tworóg node (implemented within the framework of the Kędzierzyn – Tworóg project: śląskie voivodship, Tarnogórski county) to the dam-off team of Tworzeń (Silesian Voivodeship, City of Dąbrowa Górnicza) together with infrastructure: 5 firewall systems along the pipeline route, cathode protection devices, communication and control s...
  • curprev 15:3315:33, 14 October 2020DG Regio talk contribs 14,471 bytes −847 Removed claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line,...

15 July 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 11,118 bytes +847 Created claim: summary (P836): The project consists of the construction of an ILO 8,4MPa DN1000 pipeline on the section from the designed hub of Tworóg (implemented as part of the Kędzierzyn project):Voivodship śląskie, Polnocnoski District) attached to a containment team — Twordfish (Silesian Region, city of Dąbrowa Górnicza) and infrastructure:5 Systems for the pipeline route, the cathode-ray protection equipment, the communication and control equipment, the optical line, e...

18 February 2020

8 February 2020

31 January 2020

14 January 2020

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)