Revision history of "Works on the railway no. 7 Warszawa Wschodnia Osobowa – Dorohusk on the Warsaw – Otwock – Dęblin – Lublin section, stage I" (Q85988)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 69,613 bytes −62 Changed label, description and/or aliases in lv, da, it, bg, et, sk, ro, hr, sv, fr, es, pt, de, lt, hu, ga, nl, sl, el, fi, mt, cs, and other parts

24 October 2022

27 September 2022

26 July 2022

  • curprev 04:2004:20, 26 July 2022DG Regio talk contribs 67,443 bytes +39,248 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:1521:15, 30 November 2021DG Regio talk contribs 19,214 bytes +2,115 Created claim: summary (P836): Le projet concerne la modernisation de la ligne de chemin de fer no 7 sur le tronçon Otwock — Lublin (du km 26,050 au km 175 850), les travaux sur la ligne de détour no 30 sur le tronçon Łuków — Parczew et la préparation de la documentation du projet pour le tronçon Varsovie-Otwock. Dans le cadre de la mise en œuvre de l’investissement, il est envisagé de: Je vais reconstruire les voies (la construction de la deuxième voie sur le terrain. Otwock...
  • curprev 21:1421:14, 30 November 2021DG Regio talk contribs 17,099 bytes +205 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 17,334 bytes +191 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 17,143 bytes −161 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 17,304 bytes +1,912 Created claim: summary (P836): The subject of the project is the modernisation of the railway line No. 7 on the Otwock – Lublin section (from 26.050 km to 175.850 km), together with work on the travelling line no.30 on the Łuków-Parczew section and preparation of project documentation for the section Warszawa Wschodnia – Otwock. The implementation of the investment provides for: remodeling of the tracks (the second track’s good on pc. Otwock-Pilava, easing arches), modernisat...
  • curprev 15:1315:13, 14 October 2020DG Regio talk contribs 15,392 bytes −1,478 Removed claim: summary (P836): The project involves the upgrading of the Otwock — Lublin section of railway line 7 (from km 26,050 to km 175,850), along with works on the Luk — Parczew section and preparation of project documentation for the Warszawa East — Otwock section.The following are foreseen as part of the implementation of the investment:reconstruction of tracks (the construction of a second track on the site.Otweck-Pilawa, relaxation of arcs), modernisation, recons...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 13,503 bytes +1,478 Created claim: summary (P836): The project involves the upgrading of the Otwock — Lublin section of railway line 7 (from km 26,050 to km 175,850), along with works on the Luk — Parczew section and preparation of project documentation for the Warszawa East — Otwock section.The following are foreseen as part of the implementation of the investment:reconstruction of tracks (the construction of a second track on the site.Otweck-Pilawa, relaxation of arcs), modernisation, reconstr...

18 February 2020

8 February 2020

31 January 2020

14 January 2020

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)