Revision history of "Construction of the S19 expressway Lublin – Rzeszów, w. Lublin Węglin – w. Kraśnik Południe" (Q85871)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 74,391 bytes −208 Changed label, description and/or aliases in it, sk, lv, da, fi, fr, et, ro, sv, ga, es, pt, de, hu, bg, hr, el, lt, sl, cs, nl, mt, and other parts

26 January 2023

25 January 2023

22 October 2022

26 July 2022

  • curprev 04:1704:17, 26 July 2022DG Regio talk contribs 71,482 bytes +43,203 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:0621:06, 30 November 2021DG Regio talk contribs 19,913 bytes +2,294 Created claim: summary (P836): Le projet vise à construire la voie express S19 Lublin — Rzeszów, à partir de Lublin Węglin — w. Kraśnik Sud, 41,93 km de long. Le projet en question se compose de trois volets de mise en œuvre: 1. Partie no 1 — w. Lublin Węglin (sans jonction) — Niedrzwica Duża (avec jonction) — du km 0+ 00.00 au km 12 + 046,36; 2. Partie no 2 — Niedrzwica Duża (sans le nœud) — Kraśnik Północ (sans le nœud) — du km 12 + 046,36 au km 32 + 000,00; 3. Partie no 3...
  • curprev 21:0621:06, 30 November 2021DG Regio talk contribs 17,619 bytes +166 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 17,893 bytes +158 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 17,735 bytes −125 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 17,860 bytes +2,179 Created claim: summary (P836): The project aims to build an expressway S19 Lublin – Rzeszów, odc. w. Lublin Węglin – w. Kraśnik South with a length of 41.93 km. The project consists of three sections of the project: 1. Part no. 1 – w. Lublin Węglin (without a node) – w. Nie doorzwica Duża (with a node) – from km 0 + 000.00 to km 12 + 046,36; 2. Part No. 2 – w. Nie doorzwica Large (without a node) – w. Kraśnik Północ (without a node) – from km 12 + 046.36 to km 32 + 000,00; 3....
  • curprev 14:5314:53, 14 October 2020DG Regio talk contribs 15,681 bytes −1,665 Removed claim: summary (P836): The project aims to build the S19 Lublin — Rzeszów express road.41.93 km long.This draft consists of three implementation sections:1.Part No 1. — Thorn Węglin (no node) — in the Hold Duża (with interchange) from km 0 + 000,00 to km 12 + 046,36;2.(part No 2) — in the Nedzawka Duża (junction) — in the Kraśnik Północ (junction), from km 12 + 046,36 to km 32 + 000,00;3.Parts No 3 — in the North Kraśnik Północ (with interchange), from km 32 + 000,0...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 13,973 bytes +1,665 Created claim: summary (P836): The project aims to build the S19 Lublin — Rzeszów express road.41.93 km long.This draft consists of three implementation sections:1.Part No 1. — Thorn Węglin (no node) — in the Hold Duża (with interchange) from km 0 + 000,00 to km 12 + 046,36;2.(part No 2) — in the Nedzawka Duża (junction) — in the Kraśnik Północ (junction), from km 12 + 046,36 to km 32 + 000,00;3.Parts No 3 — in the North Kraśnik Północ (with interchange), from km 32 + 000,00...

18 February 2020

8 February 2020

31 January 2020

14 January 2020

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)