Revision history of "Construction of the A1 motorway. Pyrzowice – Częstochowa" (Q85836)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)

12 October 2024

  • curprev 22:0322:03, 12 October 2024DG Regio talk contribs 84,190 bytes −294 Set a claim value: summary (P836): A parte principal do projeto é a construção da autoestrada A1 no troço Pyrzowice – o fim da estrada circular de Częstochowa, localizada na rede principal da RTE-T, o corredor Báltico-Adriático, com um comprimento total de 57,70 km. Tal inclui a inclusão da autoestrada A1 no troço existente da estrada nacional n.o 1, que tem parâmetros da autoestrada para 0,88 km (o comprimento total da integração é de 1,03 km, dos quais 0,15 km não têm parâmetros de...

22 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 82,451 bytes +2,971 Changed label, description and/or aliases in it, lv, da, sk, fi, fr, et, ro, ga, sv, es, pt, de, hu, bg, el, hr, sl, cs, lt, nl, mt, and other parts

22 October 2022

13 August 2022

  • curprev 17:2517:25, 13 August 2022DG Regio talk contribs 78,687 bytes +48,641 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 18,423 bytes +2,928 Created claim: summary (P836): La partie principale du projet est la construction de l’autoroute A1 dans le tronçon Pyrzowice — l’extrémité du périphérique de Czestochowa, située dans le réseau central du RTE-T, le corridor Baltique-Adriatique, d’une longueur totale de 57,70 km. Cela inclut l’inclusion de l’autoroute A1 dans le tronçon existant de la route nationale no 1, qui, pour le tronçon 0,88 km, présente les caractéristiques de l’autoroute (la longueur totale de la liai...
  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 15,495 bytes +122 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,813 bytes +118 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,695 bytes −123 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,818 bytes +2,470 Created claim: summary (P836): The main part of the project is the construction of the A1 motorway in the section Pyrzowice – the end of the Częstochowa ring road, located in the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km. This includes the inclusion of the A1 motorway into the existing section of national road No 1, which has parameters of the motorway for 0.88 km (the total length of integration is 1.03 km, of which 0.15 km does not ha...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 13,348 bytes −1,998 Removed claim: summary (P836): The main part of the project is the construction of the A1 motorway in the section Pyrzowice — the end of the Czestochowa bypass, located on the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km.This includes the integration of the A1 motorway into the existing section of national road No 1, which has a motorway section of 0.88 km (total length of 1.03 km, of which 0.15 km have no motorway parameters).As the pro...

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 12,809 bytes +1,998 Created claim: summary (P836): The main part of the project is the construction of the A1 motorway in the section Pyrzowice — the end of the Czestochowa bypass, located on the TEN-T core network, the Baltic-Adriatic corridor, with a total length of 57.70 km.This includes the integration of the A1 motorway into the existing section of national road No 1, which has a motorway section of 0.88 km (total length of 1.03 km, of which 0.15 km have no motorway parameters).As the proje...

18 February 2020

8 February 2020

31 January 2020

14 January 2020

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)