Revision history of "Comfort of the Johnston dam in the West Pres of La Teste de Buch" (Q3668873)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

30 September 2024

12 March 2024

7 December 2023

12 June 2023

11 August 2022

  • curprev 10:5310:53, 11 August 2022DG Regio talk contribs 49,957 bytes +32,536 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

13 January 2022

12 January 2022

6 December 2021

1 December 2021

  • curprev 06:2406:24, 1 December 2021DG Regio talk contribs 12,264 bytes +1,621 Created claim: summary (P836): Im Rahmen ihrer Politik des Managements des Hochwasserrisikos durch Meeresüberflutung entschied sich die Stadt dafür, ihre Intervention auf den Jonsthon-Deich zu priorisieren. Ziel 1: Verringerung der Anfälligkeit der Bevölkerung durch Verringerung des Risikos von Meeresüberflutung.Ziel 2: Erhaltung des empfindlichen Naturraums der Wies Salés West.Ziel 3: sicherstellen, dass der Fußweg am Kopf eines Deichs gehalten wird. Um dem zu entsprechen,...

27 November 2021

  • curprev 11:5511:55, 27 November 2021DG Regio talk contribs 10,643 bytes −1,579 Removed claim: summary (P836): Dans le cadre de sa politique de gestion des risques d’inondation par submersion marine, la Ville a choisi de priorizer son intervention sur la digue Jonsthon. Objekt 1: réduire de la vulnérabilité des populations en réduisant le risque de submersion marine.Objectif 2: PRÉSERVER l’espace naturel sensible des Prés Salés Ouest.Objekt 3: Garantir le maintien du cheminement piéton, en tête de digue.Pour y répondre, la digue sera confortée par une...

26 November 2021

  • curprev 21:4321:43, 26 November 2021DG Regio talk contribs 12,222 bytes +1,579 Created claim: summary (P836): Dans le cadre de sa politique de gestion des risques d’inondation par submersion marine, la Ville a choisi de priorizer son intervention sur la digue Jonsthon. Objekt 1: réduire de la vulnérabilité des populations en réduisant le risque de submersion marine.Objectif 2: PRÉSERVER l’espace naturel sensible des Prés Salés Ouest.Objekt 3: Garantir le maintien du cheminement piéton, en tête de digue.Pour y répondre, la digue sera confortée par une b...
  • curprev 13:3513:35, 26 November 2021DG Regio talk contribs 10,643 bytes +147 Changed label, description and/or aliases in de: translated_label

24 November 2021

22 November 2021

18 November 2021

  • curprev 12:2112:21, 18 November 2021DG Regio talk contribs 9,632 bytes +499 Changed an Item: Edited by the infer coords bot - inferring coordinates from location
  • curprev 10:2910:29, 18 November 2021DG Regio talk contribs 9,133 bytes +123 Changed label, description and/or aliases in en: translated_label
  • curprev 10:2910:29, 18 November 2021DG Regio talk contribs 9,010 bytes +1,516 Created claim: summary (P836): As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in sta...

17 November 2021